★ Mercedes 18 In 63 Rims Pirelli Mo Staggerd Tires Fits Clk E350 E500 E550 Amg on 2040-parts.com
Montclair, New Jersey, US
Wheels for Sale
Mercedes 18 in 65 rims / conti tires set 4 2010-13 fits e350 e550 c300 c350 amg(US $1,195.00)
Volkswagon wheel rim, 19" "tornado" part # 5co-601-025-n-ax1(US $49.90)
22x14 kmc xd armour chrome wheel/rim(s) 5x139.7 5-139.7 5x5.5 22-14(US $490.00)
Azul 17x7.5 inch rims (US $250.00)
20" chrome dodge wheel/rim challenger/charger/magnum(US $155.00)
22" x 8.5" helo he825 825 black 5x120 range rover cutlass bmw 745 wheels rims(US $820.00)
Toyota announces winners in design competition (w/ Video)
Tue, 20 Jan 2009Toyota has announced the winners of a sponsored design competition hosted by London's Royal College of Art. Based on the theme of ‘Intelligent Urban Living', the winners include a simple but effective vertical storage system to keep bikes out of reach of thieves and a keyboard display that makes life easier for two-fingered typists. Inspired by the design of Toyota's innovative iQ city car, which addresses many of the challenges of modern city living with its compact dimensions, the contest generated inspiration that gave a new twist to some familiar household objects and produced innovations to make modern life easier and more environmentally responsible.
Nissan Pathfinder & Nissan Navara – UK prices
Wed, 05 May 2010The Nissan Navara & Nissan Pathfinder get a 2010 update Nissan has been having a tweak at the edges for 2010 on a couple of their more rugged offerings – the Nissan Pathfinder and Nissan Navara – and has now released UK pricing for the facelifted models. But what are you getting for the new prices? The Nissan Pathfinder is more of a real off-roader than a soft-roader.
BID TO SLOW TRAFFIC ON M3 STRETCH
Fri, 14 Feb 2014FIRST it was a stretch of the M1 and now the same speed reduction plan has been announced for a stretch of the M3 motorway in Surrey and Hampshire. The Highways Agency (HA) has proposed that a three-mile section of the M3 between junction 3 at Lightwater in Surrey and junction 4 near Farnborough in Hampshire be subject to a 60mph restriction. This section is part of a 13.4-mile stretch that is being upgraded in a £174 million scheme, with the 60mph proposal, to operate between 7am and 7pm daily so air quality levels can be met.