06 07 08 09 Mazda 3 Keyless Entry Remote Kpu41794 on 2040-parts.com
Bethesda, Maryland, US
P/N: 41794
FCC ID: KPU41794
CANADA: N/A
IC: N/A
DOC: N/A
INCLUDES WORKING BATTERY
We do not provide programing instructions, Please check with google.com for the procedure.
Terms:
We need to receive your payment no later than 7 days after the auction ends. Please view top for Shipping information. All shipping comes with Delivery Confirmation. $.99 SHIPPING WITHIN U.S.A - COMBINE SHIPPING FOR ALL INTERNATIONAL PRODUCTS!! - Please wait for combine shipping invoice after Auction.
NOTE: Positive feedback will be left after positive feedback is received
Keys & Transponders for Sale
- 99 - 06 subaru outback impreza forrester legacy keyless entry remote a269zua111(US $4.99)
- 09 - 12 subaru outback impreza forrester keyless entry remote nhvwb1u711(US $10.75)
- 05 06 07 subaru impreza keyless entry remote nhvwb1u711(US $4.99)
- 10 - 12 hyundai sonata keyless entry remote osloka-950t(US $4.99)
- 09 - 11 hyundai genesis keyless entry remote pinha-t008(US $4.99)
- 99 - 04 ford mustang keyless entry remote cwtwb1u331(US $4.99)
Legendary designer Chip Foose teams up with Oakley for hot-rod shoes
Mon, 06 Sep 2010Chip Foose has designed hot rods, concept and production cars for the Detroit Three and has a room full of America's Most Beautiful Roadster and Ridler awards--the pinnacle for a hot-rodder. He's even designed a casino, the Motor City Casino in Detroit. And now, he has penned a shoe.
GM spending $336 million on plant upgrades for Volt production
Mon, 07 Dec 2009General Motors on Monday said it would spend $336 million on upgrades to the Hamtramck plant near downtown Detroit to build the Chevrolet Volt hybrid car. The plant will begin building Volt prototypes next spring, using the Hamtramck plant's existing production line. Production of saleable vehicles begins next fall.
Electric SEAT Altea & plug-in SEAT Leon hybrid revealed
Sun, 13 Nov 2011The SEAT Altea EV & plug-in SEAT Leon hybrid - testing for the next 4 years Seat may have revealed a pair of cars with ‘eco’ powerplants - the Leon TwinDrive Ecomotive and the Altea XL Electric Ecomotive – but they’re not coming to a showroom near you. Well, not before 2015, anyway. The plan is to build a small prototype fleet of the Leon Hybrid and Altea EV and make them available to local government in Catalonia and Madrid, to get evaluation and real-world feedback before the cars go in to production, which won’t be for at least four years.