Find or Sell any Parts for Your Vehicle in USA

Bbc Chevy Weiand Tunnel Ram Tapped For No2 With Max Porting Dominator Flange on 2040-parts.com

Location:

Hewitt, Texas, United States

Hewitt, Texas, United States
Condition:Used Manufacturer Part Number:123456 Warranty:No Brand:Weiand

BBC rectangle port intake tapped for no2 and has dominator flange. I see no stripped threads or repairs. This has a max porting job on it. The top head bolt mounting holes are filled with silicone and the other mounting bolt holes are elongated also. All part numbers have been ground off to polish the manifold. view pics and if you have any questions just ask.

Door Cars for Sale

Peugeot 207 GTI (2007): first official pictures

Fri, 09 Feb 2007

By Tim Pollard First Official Pictures 09 February 2007 11:18 Peugeot 207 GTI: the lowdown Could this be the hot hatch to restore the sheen on Peugeot’s GTI badge? On the experience of the French company’s past few efforts, probably not – but the 207 GTI looks set to improve on the lacklustre outgoing 206. Headline-grabbing highlights include the same 175bhp turbo 1.6 as the latest Mini Cooper S; although it’s down on power compared with punchy 190bhp+ rivals like the Renault Clio 197 and Vauxhall Corsa VXR, a brief overboost facility unleashes 195lb ft of twist for overtaking moves in the top three gears to narrow the gap.

Maserati banks on Chrysler to boost global sales

Wed, 27 Jul 2011

Fiat CEO Sergio Marchionne has bold plans for the automaker's Maserati luxury sports car unit: to boost annual sales almost tenfold to 50,000 units from 5,675 last year. Three new models are key to this midterm goal and all are based on systems and components from Chrysler Group. Maserati will introduce two new sedans to replace its Quattroporte flagship model using technology from Chrysler's large sedans such as the Chrysler 300 and the Dodge Avenger.

Ten days and counting, China traffic jam extends 60 miles

Tue, 24 Aug 2010

Tuesday marked the 10th day of a traffic jam extending more than 60 miles on China's Beijing-Tibet Expressway. The congestion is a result of road construction that is expected to continue until mid-September, the Associated Press reported. At one point, vehicles were moving little more than a half-mile a day.