Shelby Gt350 Mustang Open Cobra Lettered Tall Valve Covers on 2040-parts.com
Cheshire, Connecticut, United States
Shelby GT350 Mustang open Cobra lettered tall valve covers. These Cobra valve covers are similar to those used on the 1965 and early 1966 Shelby GT350’s but are engineered for use with more modern high RPM valve train components. They are taller than the original type with a flat top to clear roller rockers and poly locks required for today’s high RPM usage. American made in cast aluminum with highlighted fins. Now you can have the classic vintage look on your late model motor.
|
Valve Covers for Sale
1959 -1968 corvette rocker/valve covers(US $150.00)
Chevy valve & rocker cover set, 235ci, chrome, 1949-1954(US $38.24)
1954,54 chevrolet starter linkage(US $25.00)
Sb chevy sbc black nostalgic acorn 2 pc valve cover hold downs 283-350 1955-86(US $14.99)
Olds 455 mickey thompson valve covers 350, 400,330
Valve rocker cover a12 a14 a15 datsun / nissan 1200 / chromium(US $149.00)
Will Audi's e-fuel replace gasoline and diesel?
Tue, 04 Feb 2014From electric to ethanol and even hydrogen fuel cells, we’ve seen a lot of advancements in the automotive world when it comes to alternative fuel solutions. But Audi has a new technology up its sleeves in the form of synthetic e-fuel. Synthetically engineered e-fuel can replace gas and diesel, and so far Audi claims to be making significant strides in its performance and viability.
2013 Subaru XV Crosstrek: Drive Review
Mon, 12 Dec 2011What is it? To put it simply, the 2013 Subaru XV Crosstrek is an Impreza five-door with a raised suspension, specific front and rear fascias, body-side cladding and exclusive wheels. However, the company line is that the XV is not an Impreza but its own model targeting a new group of customers: urbanites.
Repair work to hit key road route
Tue, 24 Sep 2013A KEY ROAD ROUTE into London will be affected by closures at some weekends next summer for the completion of repair work. The summer 2014 work will be on the Hammersmith Flyover on the A4 in west London. Before that, there will be night-time lane closures starting next month as the final phase of work to strengthen the flyover's 16 spans begins.