Woody's Powder Coated White 7 Mm Square Backers 48 Count on 2040-parts.com
Midland, Michigan, United States
This listing is for one 48-pack of Woody's white powder coated 7 millimeter square backers.
We also have a listing for a 48-pack of black powder coated backers to make a checkerboard pattern. |
Tracks & Studs for Sale
- Camso (camoplast) snowmobile track cobra 1.6 129"/15" w/ 1.6" lug 9291c(US $629.95)
- Yamaha oem idler wheel phazer, sx viper 8es-47310-00-00(US $43.99)
- Woody's traction 1.075" gold digger studs w/nuts - 96 pack(US $139.99)
- Outillage precision drummond 012-0114 track clips bg/10(US $148.77)
- Sno stuff track cleat - 10in. 610-105 12-2002(US $11.12)
- Wps universal offset axles tki-a0504(US $157.40)
Audi TT Clubsport Quattro (2008): first pictures
Wed, 21 May 2008By Ben Pulman First Official Pictures 21 May 2008 12:34 CAR Online was first to reveal that the Speedster-inspired TT will be built, and now Audi has officially unveiled the car at the Wörthersee Tour in Austria. Called the Audi TT Clubsport Quattro, it’s an updated version of the concept of the same name seen at the same festival in 2007. And as well as a turbocharged engine producing 'more than 296bhp', today's press release claims: ‘Small-series production of this model cannot be ruled out’.
Vettel and Webber make it a 1-2 for Red Bull in China
Sun, 19 Apr 2009Red Bull's Vettel and Webber celebrate their 1-2 in Shanghai [ad#ad-1] This is the most topsy-turvy start to a Grand Prix season in many a year. First we have a rookie team – Brawn GP, which didn’t even exist a few weeks ago – taking the lead and winning the first two races of the season. And now, in Shanghai at the Chinese Grand Prix, Red Bull has achieved its first ever F1 win with a stunning 1-2 by drivers Sebastian Vettel and Mark Webber After two days of high temperatures and sunshine the Shanghai Grand Prix set off in a procession behind the safety car in torrential rain, and stayed that way for the first eight laps.
Detroit Electric delays SP:01 again
Mon, 26 Aug 2013Detroit Electric, the new startup with an old name, said it is delaying production because it hasn't secured a lease or purchase agreement for its manufacturing facility in Plymouth, Mich. It is also talking to some new partners, though the company declined to name them. North American president Don Graunstadt told the Detroit News, “To further elaborate at this juncture is, unfortunately, not possible as Detroit Electric have entered into negotiations with other parties that have the potential to impact our business strategy and timing,” Graunstadt said.