Mercury Clamp-co-pilot #72845a1 1974-86 4-110hp Mariner Outboard Boat Part # 3 on 2040-parts.com
Gulfport, Mississippi, US
Please see the attached pictures of our facility & visit our eBay store! MARINE SUPPLY is a REAL business with an enormous 26,000 sq ft retail floor, many employees and several certified marine mechanics with decades of experience on both outboard and I/O marine engines. Bid with confidence that you will be purchasing from knowledgeable, trained professionals and a company that has been in business and prospered for the past 20 years! | |||||
|
Other for Sale
- #49639a1 assembly, switch mercury/mariner outboard boat part component # 4(US $23.35)
- Reed valve assembly #186549 johnson/evinrude 1979-2006 10-235hp outboard #3(330)(US $41.97)
- Johnson/evinrude water pump kit 18-3399 or 396933(US $30.00)
- #69j-13761-00-00 injector assy 2002-2012 200hp 225hp yamaha 4-stroke f225~544~#5(US $55.00)
- yamaha 40-50 outboard 6h4-11400-14-00 crankshaft assembly 1984-2006 (2 stroke)(US $199.00)
- Seastar sea star hydraulic steering wheel housing(US $1.00)
BMW 635d (2007): first official pictures
Mon, 02 Jul 2007By Ben Whitworth First Official Pictures 02 July 2007 11:08 A diesel GT. Are they mad? Nope, quite brilliant.
BMW's new M engine needs a better voice
Thu, 26 Sep 2013BMW's M division claims its new twin-turbocharged 3.0-liter inline six-cylinder engine is every bit as good -- if not better -- than the glorious, naturally aspirated 4.0-liter V8 powerplant it replaces in the new M3 sedan and M4 coupe. The figures are certainly impressive. They say it kicks out 424 hp and more than 25 percent extra torque, with what is described as significantly more than 369 lb-ft below 2,000 rpm.
New speed cameras planned for motorways
Wed, 05 Feb 2014NEW SPEED CAMERAS painted grey and placed along large sections of the UK’s motorway could be introduced within two years. The Highways Agency is looking to increase the amount of ‘managed motorway’ on the network – sections where the overall speed of traffic is adjusted up and down to avoid traffic jams and to allow the use of hard-shoulder running. Currently sections of the M25 and M40 operate variable speed limits Under new plans however cameras will be placed on large sections of motorway designed to catch drivers exceeding the overall 70mph limit.