Propeller Shaft Assembly #436888 #0436888 Johnson/evinrude 1996-1998 90-115hp on 2040-parts.com
Gulfport, Mississippi, US
Please see the attached pictures of our facility & visit our Ebay store! MARINE SUPPLY is a REAL business with an enormous 26,000 sq ft retail floor, many employees and several certified marine mechanics with decades of experience on both outboard and I/O marine engines. Bid with confidence that you will be purchasing from knowledgeable, trained professionals and a company that has been in business and prospered for the past 20 years! | |||||
|
Other for Sale
- #892910t02 coil harness assembly 110/135/150/175hp 2006 mercury mariner part 282(US $57.98)
- #586247/0586247 flywheel assembly 1997-98 150/175hp johnson/evinrude part~467~ (US $60.00)
- 125-225hp #0439079,439079 repair kit,carb. 1993/98 johnson/evinrude outboard # 5(US $29.96)
- Vintage johnson 6 gal steel gas tank outboard motor fuel can w/ gauge & fitting(US $59.99)
- Coupling #980994/0980994 1977 140hp omc sterndrive i/o boat motor part # 3(US $99.96)
- #60v-85580-00-00 coil, pulser 150-300hp 2003-05 yamaha generator outboard~262~(US $54.98)
Driven: Citroën C4 Cactus
Thu, 10 Jul 2014It wasn't our intention to hunt down random old Citroëns in the new C4 Cactus – on our first acquaintance with this new car in Amsterdam, they found us. The first was a beige 1971 DS Safari. It cruised by as we stopped for a photocall on the outskirts of the Dutch capital.
New Maserati Kubang SUV (2012) arrives at Frankfurt
Tue, 13 Sep 2011New Maserati Kubang We’ve been predicting the arrival of a Maserati SUV for some time, but the recent launch of the new Jeep Grand Cherokee made it almost certain. And today the new Maserati Kubang arrives at Frankfurt, to the consternation of all Maserati fan boys. But whatever the fans of the marque may say, an SUV from Maserati is a very clever move.
RAC Foundation – Road charging is inevitable
Tue, 06 Jul 2010The RAC Foundation calls for Road Charging. According to RAC Foundation Director Stephen Glaister, a predicted 33% increase in traffic by 2025 and a reduction in road building schemes and cuts in general make a pay as you go system the answer to congested roads. All of which is fine and dandy – it gives the RAC Foundation something to do and gets them a bit of PR – but it”s hardly joined-up thinking.