02 Buick Rendezvous Cx Info Center Switch #12199275 Good Used Oem 33204 on 2040-parts.com
Rhinelander, Wisconsin, US
Switches / Controls for Sale
- 04-07 bmw e60 e62 5-series window regulator motor lh driver front oem 05 06(US $54.99)
- Nos 1973 ford gran torino, mustang, ltd, pinto relay for heated rear window(US $29.95)
- 00-06 ford taurus sable heater heat switch ac climate control knob 1(US $4.49)
- 97 honda prelude electric door master switch lh left 7826(US $50.00)
- 1996 gmc jimmy rear passenger power window switch(US $12.65)
- Nos 1973-1977 ford ltd, galaxie 500 heater blower motor switch(US $24.95)
First Chinese MGs built
Tue, 27 Mar 2007By Jack Carfrae Motor Industry 27 March 2007 02:17 Today is an historic day for Nanjing Automotive as the first MG built outside Longbridge will leave the production line at Nanjing’s factory in China. Around 1000 visitors are gathering at the plant to join in with the celebrations, where the new, Chinese-built MGs will be on display (above). The first cars off the production lines are the MG TF and the MG 7, which Brits will remember as the MG ZT.
Nissan strengthens Brazil connections with new design studio
Fri, 20 Jun 2014Nissan has opened a new design studio in downtown Rio de Janeiro. Located within Nissan Brazil's headquarters, Nissan Design America – Rio (NDA-R) is operated as a satellite of the firm's studio in San Diego, California. Since November 2013, Robert Bauer has been leading a small team at NDA-R with two Brazilian designers: one color and trim designer and one exterior designer.
Japan automakers extend shutdowns as quake impact widens
Mon, 14 Mar 2011Japan's seven big automakers are extending nationwide production shutdowns amid growing concern about supply chain interruptions, power shortages and export difficulties following the massive earthquake and tsunami that hammered northern Japan, killing thousands. Toyota Motor Corp., one of the few automakers with a major manufacturing presence in the quake zone, suspended all manufacturing--at both assembly and parts plants--on Monday and extended the shutdown through at least Wednesday as an added precaution. The company will lose output of roughly 40,000 vehicles over the three-day period, spokesman Dion Corbett said.