Find or Sell any Parts for Your Vehicle in USA

03 04 Infiniti G35 Sedan Chrome Billet Grille Grill 3pc Combo on 2040-parts.com

US $88.00
Location:

Monterey Park, California, US

Monterey Park, California, US
Returns Accepted:Returns Accepted Refund will be given as:Money back or exchange (buyer's choice) Item must be returned within:14 Days Return policy details:please refer to the listings for details Return shipping will be paid by:Buyer Restocking Fee:No Part Brand:AutoModZone Manufacturer Part Number:1701C3051C

Middlecott Sketchbattle Experiment crowns first Sketchmaster

Tue, 28 Jan 2014

College for Creative Studies (CCS) student Graham Wright has fought off competition from artists, illustrators, industrial, product and car designers to be declared the Sketchmaster of the Middlecott Sketchbattle Experiment 2014. Held at Detroit's Kunsthalle Museum of Contemporary Art, the contest – a self-styled fight club of design – carried the theme of lighting because of the museum's many neon and lighting installations. Before the event, design students from the area – mostly from the CCS and Lawrence Technological University (LTU) – were invited to submit early sketches before a shortlist was drawn up for the main event.

McLaren MP4-12C to cost £168,500

Wed, 24 Nov 2010

McLaren will charge £168,500 for the MP4-12C supercar in the UK. That's the new 2011 price, including the rise in VAT from 17.5% to 20% from 1 January. Today's news means that the MP4-12C will cost £1000 less than a Ferrari 458 Italia, its arch rival, at existing tax rates.

Peugeot Citroen idles Slovak factory over falling orders

Thu, 20 Oct 2011

PSA to halt production of 207 & C3 Picasso in Slovakia The news that Peugeot Citroen (PSA) is to suspend production at its factory in Trnava, Western Slovakia, as orders for cars fall away, is another sign of the impending gloom in the Euro zone car industry. PSA has revealed that the Trnava factory – which produces the Peugeot 207 and Citroen C3 Picasso – will be shut from October 28th to November 18th (a period which does include two bank holidays) as orders start to fall away and production exceeds demand. But this announcement seems to be the tip of the iceberg for PSA’s factory closures.