05-13 Frontier King Cab 3" Polished Stainless Steel Side Step Bar Running Board on 2040-parts.com
Rowland Heights, California, US
Nerf Bars & Running Boards for Sale
- 02-06 envoy 02-09 trailblazer 3" black powder coated side step nerf bar board(US $68.99)
- 07-13 fj cruiser chrome side step nerf bar running board polished upgrade(US $78.99)
- 05-13 tacoma access cab 3" black powder coated side step nerf bar running board(US $71.99)
- 4" ss stainless side step nerf bars running boards 05-11 dakota club/ext cab cs2(US $142.99)
- Hummer h3 manik rocker bars 2006 stainless new 453062sp(US $150.00)
- Gmc step bar assembly 120921113 new (US $400.00)
Land Rover LRX heads for production
Thu, 24 Sep 2009Land Rover will build a production version of the LRX concept small SUV, the company said on Thursday. The new Land Rover will go on sale in 2011. Also Thursday, owner Tata Motors Ltd.
TMG Sports 605 concept to debut at Essen Motor Show
Tue, 27 Nov 2012While most of us are focusing on the LA Auto Show happening later this week, Toyota Motorsport GmbH is quietly revealing the TMG Sports 650 concept at the Essen Motor Show in Germany. The TMG Sports 650 is a hopped-up, twin-turbocharged V8 version of the normally staid Lexus LS460 sedan. In the concept, power grows from 386 to an impressive 641 hp at 7,450 rpm, while torque jumps to 564 lb-ft.
BAC Mono moves to Liverpool
Wed, 10 Jul 2013The BAC Mono with brothers Brigg & Mayor of Liverpool (pictured) The BAC Mono is in the public eye this week after its impressive performance on Top Gear, but even without the publicity from Top Gear the brothers Brigg were already doing very well with the Mono. So well, they’ve been looking for new premises to continue their growth and have settled on a move from Cheshire to Liverpool (just up the road) and a new facility on the Speke Hall Industrial Estate in South Liverpool is set to become the new home of the Mono. BAC’s new home in Speke will be up and running by the autumn, will create an additional 60 jobs in the local economy – and more in the supply chain – and is expected to turn out more than 100 Monos a year by 2015.