Find or Sell any Parts for Your Vehicle in USA

1 New Gmb Front Left Or Right Wheel Hub Bearing Assembly W/o Abs 730-0215 on 2040-parts.com

US $45.95
Location:

Arcadia, California, US

Arcadia, California, US
Returns Accepted:Returns Accepted Refund will be given as:Money Back Item must be returned within:14 Days Return policy details:Restocking fees: No Return shipping will be paid by:Buyer Restocking Fee:No Brand:GMB Manufacturer Part Number:730-0215 Interchange Part Number:TIMKEN: 513017K , National Bearings: 513017K Placement on Vehicle:Front Warranty:Yes Bolt Flange:Three Bolt Flange Drive Type:Driven Hub Brake Component:w/o ABS Lugs:5-Lugs Bearing Type:Ball Generation:GEN 3

NHTSA safety consultant dies at 64

Tue, 13 Mar 2012

Miami trauma surgeon and preeminent car-crash researcher Jeffrey Augenstein would often tell the story of the time he was talking to a crash victim who collapsed and died from hidden injuries in the middle of the conversation. The experience led Augenstein to research and then call attention to the unexpected injuries that could occur when drivers interacted with airbags. It's but one example of the achievements of Augenstein, who died recently at age 64.

Mitsubishi Outlander (2006): first official pictures

Fri, 29 Sep 2006

By Phil McNamara First Official Pictures 29 September 2006 03:00 Mitsubishi Outlander: the lowdown Mitsubishi has finally unveiled the European Outlander, 11 months after the seven-seat crossover hit Japanese showrooms. But you'll still have to wait until 1 March 2007 to get your hands on the mid-size SUV. The Outlander is certainly a crossover, combining car-based underpinnings and primarily two-wheel drive with lockable four-wheel drive for when you hit the muddy stuff.

London underpass to hold flood water

Mon, 10 Feb 2014

A PEDESTRIAN UNDERPASS is to be turned into an emergency pond to hold hundreds of thousands of litres of floodwater threatening homes and businesses in south London. The Purley Cross underpass will be used to hold water pumped from around 400 under-threat buildings in parts of Kenley and Purley and to stop a water treatment works which supplies tens of thousands of homes from flooding, Croydon Council said. The authority said the plan to use the underground footway to hold around 600,000 litres of water from tonight was approved after its "primary" pond at Purley Depot overflowed last night.