14-19 Ski-doo Renegade X 800r 600 E-tec Indicator Support Black 517305511 on 2040-parts.com
Air Intake & Fuel Systems for Sale
- Intake manifold boot joint carburetor carb fit for ski-doo/550f expedition(US $16.61)
- 200 09 10 skidoo summit rev xp 800 air cleaner filter box airbox(US $66.99)
- Sp1 in-tank filter 1/4"(US $11.95)
- Arctic cat new oem pump kit,fuel-square, 0636-640 nos ac(US $18.99)
- 2004 ski doo mxz 800 ho renegade with dpm primary air box silencer cleaner(US $49.99)
- Brp ski-doo can-am sea-doo xps new oem 2-stroke full synthetic oil quart 9779126(US $25.99)
Refreshed Looks Signal Arrival Of Updated Yaris
Tue, 22 Apr 2014HOT on the heels of its newly launched Aygo city car, Toyota has released the first details of its refreshed Yaris supermini. Scheduled to hit the showrooms this summer, the restyled car boasts an improved interior and better vehicle dynamics that its maker believes will position the car as one of the strongest contenders in the fiercely competitive supermini market. The Yaris follows the example of new Aygo, adopting a dramatic look that integrates a distinctive cross shape, centred on the front emblem, which separates the new-look upper and lower grilles.
Lexus launches 'Design Matters' campaign
Wed, 24 Apr 2013Lexus has hosted an event called ‘Design Matters' in New York City, as part of a new strategy to showcase the brand's commitment to design. Toyota's global president Akio Toyoda attended the event along with Mark Templin, executive vice president of Lexus International, who said, "Lexus is expanding as a global company and we need to speak to a broad global audience. There's no better way to do that than through design." Templin used the event to announce its other design-related campaigns.
Green Light For More Smart Motorway Schemes
Wed, 09 Jul 2014THE Government has announced plans to speed up journey times on selected parts of the nation’s motorway network. As a result, work will start to convert the hard shoulder into a running lane on two sections of the M1 and on a stretch of the M3. The M1 work will be between junctions 28 and 31 in Derbyshire and between junctions 32 and 35a in South Yorkshire, with claims that it will boost capacity by up to a third and improve journey times by up to 10%.