Find or Sell any Parts for Your Vehicle in USA

18 Inch Wheels Rims Hyper Black Ford Fusion 500 Mustang Flex Edge 5 Lug 5x4.5 on 2040-parts.com

US $639.00
Location:

Titanium PowerSeller, US

Titanium PowerSeller, US
Returns Accepted:Returns Accepted Refund will be given as:Money Back Item must be returned within:30 Days Return policy details:Returns accepts for unused new product. Once tires have been mounted on the wheels, they are used. All returned items must be returned in original packages with all protective material in place as the order was shipped originially. Money back less 15% reboxing charge and shipping costs unless it is our error. Return shipping will be paid by:Buyer Restocking Fee:No Rim Material:Alloy Rim Width:8 Rim Diameter:18 Number of Bolts:5 Bolt Pattern:Array Hub Bore:72 Rim Brand:Motegi Racing Manufacturer Part Number:MR27478817 Rim Structure:One Piece Age:NEW

Ford Motor Company design chief J Mays to be based in London

Sat, 18 Dec 2004

J Mays, Ford Motor Company group vice president for design, will be moving from the US to London in February and adding a new title: Chief Creative Officer. The new posting will allow Mays to work more closely with designers at Ford's Premier Automotive Group, including Ian Callum at Jaguar, Geoff Upex at Land Rover and Volvo's next design head. He will spend about 10 days a month in Dearborn with the North American design team.

Honda recalls 1.5 million Accord, CR-V and Element models for transmission fix

Fri, 05 Aug 2011

Honda is recalling 1.5 million cars and crossovers to reprogram the transmission control software to prevent damage if the automatic transmission is used to rock the vehicle out from being stuck in mud or snow. The recall covers the Accord and the CR-V and Element crossovers from the 2005 through 2010 model years. The vehicles being recalled have four-cylinder engines.

Detroit Electric delays SP:01 EV

Mon, 03 Jun 2013

Detroit Electric will delay the SP:01 EV roadster for at least a month, according to a company executive who talked to the Detroit News. The company still hasn’t finalized a manufacturing location in Wayne County. Production was scheduled to start in August, now it’s slated for September.