19" Wheels Rims Tires Curva 7 Silver 5x120 Staggered 19x8.5 19x9.5 Acura Tl 2009 on 2040-parts.com
Stockton, California, US
Wheels for Sale
- 20" panther 911 5x115 wheels rims tires impala 2000 2001 2002 2003 2004 2005 (US $1,299.00)
- 22" ver210 wheels rims tires 5x115 charger challenger magnum 300c nitro(US $1,499.00)
- 24" vw865 wheels rims tires 6x139.7 sierra 2007 2008 2009 2010 2011 2012(US $1,799.00)
- 20" 20 inch xix 25 wheels rims tires staggered 2010 camaro ss pirelli tires (US $1,999.00)
- 26" inch scarlet 8 wheels rims tires 6x139.7 silverado 2002 2003 2004 2005 2006 (US $2,499.00)
- 24" inch wheels rims dw9 6x139.7 cadillac escalade 2007 2008 2009 2010 2011 2012(US $1,175.00)
Megane Renaultsport 265 Trophy grabs Nurburgring Record
Fri, 17 Jun 2011Megane Renaultsport 265 Trophy and the Nurburgring crew First we get the news that Renault has pushed out a limited edition Megane Renaulsport – the Megane Renaulsport 265 Trophy with a slightly tweaked and titivated version of the Megane Renaultsport 250 – and now we get the follow-up publicity with the claim of a new Nurburgring record for the brisk Megane. This isn’t a record that’s quite as daft as some of the records that are claimed for the Nurburgring (there almost seems to be a specific category of ‘Record’ time to fit every car maker’s needs), but it does seem a bit obscure. It’s the Nurburgring record for the fastest production front wheel drive car.
Join the Autoweek America Adventure--on us!
Thu, 22 Sep 2011You can win a chance to hit the road from Seattle to SEMA during the Autoweek America Adventure. We're giving away a free vehicle entry and a $2,000 Amex gift card to one lucky team. The contest starts on Sept.
Councils to cut roadworks red tape
Tue, 19 Aug 2014COUNCILS in England could soon have the power to cut red tape and make road works much quicker and more accountable. The plan is to introduce permits for any company that wants to dig up a road, which means they will have to co-ordinate their work with other companies and local authorities to reduce the impact of delays on the public. The permit scheme could come into force as early as April 2015 and means anyone applying for a permit to carry out road works will need to present a convincing case for the work.