Find or Sell any Parts for Your Vehicle in USA

1953-1954-1955-1956-1957-1958-1959 Oldsmobile 12 Volt Generator Restoration on 2040-parts.com

US $159.95
Location:

Rockford, Illinois, US

Rockford, Illinois, US
Returns Accepted:Returns Accepted Item must be returned within:14 Days Refund will be given as:Money Back Return shipping will be paid by:Buyer Return policy details: Restocking Fee:No

This is rebuilt to factory specs, all taken a part and cleaned up with new, brushes,bearings,bushings, studs and insulators. painted and put back together we will install a new data plate  

 fiits all OLDSMOBLE 53-59 12 volt 30 amps  **** I will stamp the date code for you*****       

 

Posted with eBay Mobile

Local Motors announces winners of Terra Prix 2085 design competition

Wed, 13 Jul 2011

Local Motors has announced the 10 winners of its Terra Prix 2085 Concept Design competition. The competition brief asked entrants to design a two-person race vehicle that could navigate every terrain imaginable on every continent, as well as a support craft for any maintenance needed throughout the race. The support craft had to be able to carry tools, extra parts, any potential module changes for different terrain as well as enough 'fuel' for both vehicles to move between three major checkpoints.

Supermarkets slash fuel prices for bank holiday

Tue, 19 Aug 2014

SUPERMARKETS have announced fuel-price cuts ahead of the August bank holiday getaway. From tomorrow Asda, Sainsbury's and Tesco are all reducing the cost of their petrol by up to 2p a litre, with diesel going down by 1p a litre. In Asda's case, this will take the price of its petrol to no more than 124.7p a litre, with diesel at 128.7p for diesel – its lowest prices since January 2011.

Repair work to hit key road route

Tue, 24 Sep 2013

A KEY ROAD ROUTE into London will be affected by closures at some weekends next summer for the completion of repair work. The summer 2014 work will be on the Hammersmith Flyover on the A4 in west London. Before that, there will be night-time lane closures starting next month as the final phase of work to strengthen the flyover's 16 spans begins.