1977 Honda Four Series Civic-cvcc 91 Ci (1488cc) 4-cylinder Models Tune Up Chart on 2040-parts.com
Manchester, New Hampshire, United States
Honda for Sale
- 1976 honda four series accord-cvcc 98 ci (1600cc) 4-cyl models tune up chart(US $10.00)
- 1977 honda four series accord-cvcc 98 ci (1600cc) 4-cylinder model tune up chart(US $10.00)
- 1976 honda four series civic 76 ci (1238cc) 4-cylinder models tune up chart(US $10.00)
- 1978 honda four series civic 76 ci (1238cc) 4 cylinder models tune up chart(US $10.00)
- 1978 honda four series civic-cvcc 91 ci (1488cc) 4 cylinder models tune up chart(US $10.00)
- 2001 honda accord sedan oem owner's owners manual (booklet only)(US $5.99)
Government CO2 cock-up
Sun, 03 Jun 2007By Richard Yarrow Motoring Issues 03 June 2007 02:32 Britain’s new eco-motoring scheme postponed Plans to help Britain’s drivers choose the greenest car for their budget have been thrown into chaos, CAR Online can reveal. The launch of a new Government website for motorists – called www.actonco2.co.uk – has been cancelled just 16 hours before it was to go live. Amazingly, the Department for Transport (DfT) has admitted the eleventh hour delay was because it realised the CO2 data to published wasn’t accurate.
Audi TT Offroad shows off at Beijing auto show
Thu, 24 Apr 2014Audi introduced the TT Offroad concept at the Beijing motor show last week. The company says it comes with a plug-in hybrid drive system delivering 408 hp total, while getting 123.8 miles per gallon -- impressive, but we're guessing not exactly real world. To get that power, the TT Offroad concept uses the company's 2.0-liter turbocharged four-cylinder, making 292 hp and 280 lb-ft of torque.
Ford Design Center set to expand
Wed, 13 Apr 2011Symbolic of the importance it plays in Ford's small car strategy, the automakers Design Center in Cologne, Germany, is about to receive a €11.6m redevelopment. Construction is already underway on the facility's new wing, which will include design studios and 100 workplaces. The 3,000 square-meter extension is set to be completed by the end of the year.