1980 Honda Cr250 Engine Lower End Gearbox Cases Elsinore Cr 250 1978 1979 on 2040-parts.com
Sterling, Michigan, US
Components for Sale
- 1980 honda cr250 cylinder head elsinore cr 250 1978 1979(US $99.00)
- New nos yamaha piston rings gt1 gt80 gtmx lb80 mx80 ty80 yz80 0.50 oversize(US $19.99)
- Athena big bore kit - 144cc p400250100011(US $696.90)
- New nos honda 33600-mr1-000 turn signal assembly - vf750cd, vf750c, vt600cd, (US $34.99)
- Oem 07 and newer harley tc cylinder heads pair front and rear touring(US $319.99)
- 01 yamaha yz 250 complete motor engine(US $655.00)
Apple iWatch illegal to use while driving
Thu, 11 Sep 2014The Department for Transport (DfT) has confirmed that any driver caught using Apple’s new iWatch wearable technology behind the wheel will receive the same penalty as if they were using a mobile phone. The new “smartwatch” was announced this week and allows wearers to read text messages, make phone calls and browse the internet on the device. On Bing: see pictures of the Apple iWatch Apple to launch app that finds your car The wristwatch is wirelessly linked to the user’s mobile phone, which supplies the data connection to surf the web and make and receive calls.
Pebble Beach Debut For New Range Rover Sport SVR
Mon, 11 Aug 2014LAND Rover is taking the performance SUV fight to Porsche as the Brit luxury car maker has unveiled a 550 horsepower version of its popular Range Rover Sport. The car, which is being launched at the prestigious Pebble Beach concourse event, is the fastest, most powerful Land Rover ever produced and the first to wear the SVR designation being adopted by future Land Rover and Jaguar high-performance models. The Range Rover Sport SVR accelerates from 0-60mph in 4.5 seconds and boasts a top speed electronically limited to 162mph plus a Nurburgring Nordschleife lap time of 8 minutes 14 seconds – one of the fastest times ever recorded by a production SUV.
Councils to cut roadworks red tape
Tue, 19 Aug 2014COUNCILS in England could soon have the power to cut red tape and make road works much quicker and more accountable. The plan is to introduce permits for any company that wants to dig up a road, which means they will have to co-ordinate their work with other companies and local authorities to reduce the impact of delays on the public. The permit scheme could come into force as early as April 2015 and means anyone applying for a permit to carry out road works will need to present a convincing case for the work.