1988 Quicksilver Marine Service And Maintenance Tools Manual P/n 90-86141--2 on 2040-parts.com
FL, United States
Boats & Watercraft for Sale
- Pm201 mercury mercruiser electrical harness diagram #8m2000470 p/n 90-869241(US $14.99)
- Pm201 mercury mercruiser electrical harness diagram #84-862164a2 p/n 90-869231(US $14.99)
- Pm201 mercury mercruiser electrical harness diagram #84-862164a04 p/n 90-869233(US $14.99)
- Pm201 mercury mercruiser electrical harness diagram #84-865245a03 p/n 90-869246(US $14.99)
- Pm198 2007 mercury 40/50/60 efi 4-stroke remote control engine harness 879191004(US $12.95)
- Pm198 2007 mercury 40/50/60 efi 4-stroke tiller handle engine harness 879191010(US $12.95)
Range_e (2013) - the hybrid electric Range Rover Sport
Tue, 11 May 2010Land Rover today confirmed its first hybrid models will be launched in 2013. The new Range_e is a showcase for the company's diesel-electric hybrid tech in a current Range Rover Sport bodyshell. Tests will start in late 2010 with a small fleet of five hybrids - but bosses have set a 2013 production date, coinciding with the launch of the large family of Land Rovers.
BMW 1 Series dead in US after 2013
Fri, 18 Oct 2013With its successor set to bow at the Detroit Auto Show in a couple of months' time, word's come down from BMW that 2013 will indeed be the end of the line for the BMW 1 Series — at least in the US. It will remain available elsewhere in the world as a three-door and five-door hatch. The coupe and convertible, meanwhile, are being replaced by the 2 Series, in convention with BMW's new naming scheme.
Councils to cut roadworks red tape
Tue, 19 Aug 2014COUNCILS in England could soon have the power to cut red tape and make road works much quicker and more accountable. The plan is to introduce permits for any company that wants to dig up a road, which means they will have to co-ordinate their work with other companies and local authorities to reduce the impact of delays on the public. The permit scheme could come into force as early as April 2015 and means anyone applying for a permit to carry out road works will need to present a convincing case for the work.