1994 1995 1996 Oldsmobile Silhouette Ac Climate Control Oem W/rear Defroster on 2040-parts.com
Hughesville, Pennsylvania, US
What I have listed is a good used manual climate control w/AC for the following: LUMINA VAN 94-96 w/AC, w/rear defroster Ident: 16191293
SILHOUETTE 94-96
Ident: 16219973
If you have any problems, just send an email.
FREE SHIPPING IN THE USA
Hollander # 642
A/C & Heater Controls for Sale
- 1997 1998 1999 2000 chevy malibu ac climate control oem w/rear defroster(US $49.95)
- 1995 1996 chevy lumina car ac climate control oem w/rear defroster(US $34.95)
- 1998 1999 2000 ford crown victoria ac climate control oem(US $24.95)
- 2000 2001 chevy lumina car ac climate control oem w/rear defroster(US $24.95)
- 1999 2000 2001 2002 2003 ford windstar ac climate control oem w/o rear ac(US $29.95)
- 2007 2008 ford f150 ac climate control oem non-heated back glass or mirrors(US $49.95)
Ford reports record $1.7 billion profit
Tue, 26 Oct 2010Ford Motor Co. reported record third-quarter profits on Tuesday, raised its production forecast and said it will speed up steps to cut its debt. Ford's $1.7 billion in net income was up from $997 million a year earlier.
Jaguar XF-R unveiled at Detroit auto show 2009
Sat, 10 Jan 2009By Tim Pollard Motor Shows 10 January 2009 22:52 Jaguar's XFR is shown today at the Detroit auto show 2009 – and the XFR at a stroke becomes the fastest saloon the Midlands manufacturer has ever made for the roads. Jag has taken the XF saloon and fettled it with the new direct-injection 5.0-litre V8 petrol engine that supersedes the familiar 4.2, but breathed upon by a new supercharger to crank out a wholesome 503bhp.The R model is extremely rapid, thanks to a classic Ayers Rock torque curve that peaks at 461lb ft from just 2000rpm and doesn't go away until 5000rpm. There's brawn wherever you need it, and the XFR scuttles to 60mph in a scant 4.7sec.
Green Light For More Smart Motorway Schemes
Wed, 09 Jul 2014THE Government has announced plans to speed up journey times on selected parts of the nation’s motorway network. As a result, work will start to convert the hard shoulder into a running lane on two sections of the M1 and on a stretch of the M3. The M1 work will be between junctions 28 and 31 in Derbyshire and between junctions 32 and 35a in South Yorkshire, with claims that it will boost capacity by up to a third and improve journey times by up to 10%.