1997 1998 Subaru Legacy 2.2l Awd Automatic Auto Transmission Tranny Oem on 2040-parts.com
Grants Pass, Oregon, US
Other for Sale
- 97 98 99 subaru legacy right rear side door sedan electric factory oem(US $149.00)
- 95 96 97 98 99 subaru legacy sedan trunk lid factory oem used(US $130.00)
- 95 96 97 98 99 subaru legacy sedan driver rear door glass left lh factory oem(US $49.00)
- 11 12 13 dodge charger r/t complete interior wiring harness to fusebox(US $250.00)
- Designer sport grip rare yellow/lemon metallic extra thick steering wheel cover(US $7.45)
- 93-98 jeep grand cherokee laredo r/h passenger side firewall bracket(US $24.49)
Mazda outlines weight-loss program
Thu, 12 Nov 2009Mazda Motor Corp. will reduce its vehicle weights by at least 220 pounds beginning in 2011, with a combination of lighter-weight materials, smaller vehicle footprints and new engineering processes, a top executive says. The typical Mazda vehicle has gained 80 pounds with each successive redesign, “mostly in larger tires and wheels, and safety equipment,” said Robert Davis, senior vice president of product development and quality for Mazda North American Operations.
Updated 2014 Volkswagen Polo prices confirmed
Tue, 25 Mar 2014Volkswagen has confirmed its new 2014 Polo supermini will go on sale in the UK on 23 April 2014, with prices starting from £11,100 for the entry-level 60hp 1.0-litre S variant. Prices rise to £19,715 for the range-topping five-door Polo Blue GT model fitted with VW’s 150hp 1.4-litre TSI petrol turbo engine with cylinder deactivation technology. It is mated to a six-speed manual as standard, or the firm’s seven-speed DSG gearbox as an option.
Jaguar Land Rover installs UK's largest solar roof
Tue, 08 Apr 2014THE LARGEST EVER solar panel roof has been completed at the Jaguar Land Rover (JLR) engine factory in South Staffordshire. More than 21,000 solar cells have been fitted to the roof over the Engine Manufacturing Centre and will provide enough electricity to power 30% of the factory’s needs. When the solar panels are working at full capacity, they will generate enough energy to power the equivalent of 1600 homes.