1999 2000 2001 2002 Chevy Silverado 1500 2pc Upper Replacement Billet Grille on 2040-parts.com
Port Richey, Florida, US
Grilles for Sale
- 1997 1998 1999 cadillac deville 1pc bumper black billet grille kit overlay 97 98(US $130.05)
- 2002 - 2005 ford explorer upper replacement & bumper 2pc black billet grille kit(US $181.28)
- 2004 2005 2006 chrysler pacifica 1pc upper replacement black billet grille 04 05(US $100.29)
- 1998 - 2003 gmc jimmy s-15 combo 3pc chrome billet grille kit 98 99 00 01 02 03(US $105.39)
- 2006 chevy silverado 1500 ss 1pc bumper black billet grille kit lower(US $48.59)
- 2005 - 2008 toyota corolla combo billet grille kit replacement upper 05 06 07 08(US $128.71)
News watch April 2012: today's auto industry news
Mon, 30 Apr 2012Welcome to CAR Magazine's news aggregator as we round up the daily stories in the auto industry. Top tip: news summaries are added from the top hour-by-hourMonday 30 April 2012• Kia posted global first quarter 2012 profits up 26%, with sales up 12% worldwide. 635000 new Kias found homes, 79000 in Europe (up 24.6% on 2011 in a total market which contracted 7.1%), with the USA now Kia's largest market ahead of Korea.
Ford Fiesta “Centura” – 100 years of Ford UK
Mon, 08 Aug 2011Ford Fiesta Centura Ford isn’t a British company – even if many of us think of Ford as a patriotic buy – although they’ve been in the UK for 100 years. And to celebrate that landmark they’ve revealed the Ford Fiesta Centura, a limited edition of just 1,000 cars. Based on the Fiesta 1.25 Zetec, the Fiesta Centura gets £600 worth of extras – metallic paint (Panther Black only), chrome mirrors, 16″ alloys, auto lights and wipers, rear parking sensors, reversing camera and LED running lights – and costs £13,395 for the three-door and £13,995 for the five door.
July 9: Keeping it topped off
Fri, 09 Jul 2010As expected, when I walked back to my parking space at VSP parking across the street from Burbank Airport the i-MiEV was fully charged. No problem. It had more than 24 hours to get charged and it can't take more than 16 hours to do it, if you figure one hour per kWh at 120 volts.