20 Inch Chrome Porsche Cayenne Panamera Techno Gts Wheels Rims on 2040-parts.com
San Diego, California, United States
Wheels for Sale
20 inch porsche 911 turbo/ turbo s black wheels rims free shipping(US $895.00)
19 inch porsche boxster 911 cayman wheels rims(US $695.00)
20" toyota sequoia land cruiser tundra rims lexus lx470 lx570 5x150 2016 wheels(US $885.00)
N13-1875i40fk 18x7.5 5x112 5x4.5 (5x114.3) wheels rims machined black chrome(US $796.40)
Bmw 3 series 4 series 17x8 factory original oem alloy wheels rims 71453(US $899.99)
One nice 16" 01 02 03 04 05 hyundai xg factory oem wheel rim 70697(US $75.00)
Skoda Octavia Hatch GreenLine arrives offering 88.3mpg – price from £20,150
Mon, 20 Jan 2014Skoda Octavia Hatch GreenLine (pictured) promises 88.3mpg Even though official economy figures from car makers are, at best, disingenuous, they still serve, to a degree, and an indicator of a car’s relative economy. So the arrival of the Skoda Octavia Hatch GreenLine in Skoda’s UK showrooms with official economy figures of 88.3 mpg and emissions of just 85g/km, makes it an appealing offering for cost conscious private and fleet buyers. The Octavia Greenline Hatch looks pretty much the same as any other Octavia, so you won’t be driving a car that shouts ‘I’m a cheapskate’, but you will get extra eco stuff like low rolling resistance tyres on 16″ Velorum alloys to give you the best chance of getting close to the official economy figures.
Nissan NV200 (2012): London's next taxi cab?
Tue, 07 Aug 2012The London black cab is being thoroughly rebooted, and it's Nissan who's challenging the dominance of the traditional black taxi. It's brought a new NV200 London Taxi to the capital during the 2012 Olympics in its bid to replace one of the world's most iconic vehicles. Nissan claims the NV200 cab will be cheaper, greener, and more user-friendly than the current fleet of LTI TX4s, and we may yet see a fully electric version join the ranks if trials are successful.
GM stops Chevy Volt production to trim inventory
Fri, 02 Mar 2012General Motors will idle the Detroit-area assembly plant that builds the Chevrolet Volt for more than a month to curb rising inventories of the plug-in hybrid. On March 1, GM told 1,300 workers at its Detroit-Hamtramck assembly plant in Michigan that it will shut down production for five weeks, starting the week of March 19. GM plans to resume production on April 23, spokesman Chris Lee said.