2001-2004 Evinrude / Johnson 40-50 Hp Four Stroke 5032610 Flywheel on 2040-parts.com
Dubuque, Iowa, United States
Flywheel #5032610 removed from a working outboard. model E50PL4SI , Johnson/Evinrude /Suzuki. Please check cross reference numbers to see if parts fit. Only shipped to lower 48 states
|
Powerhead Components for Sale
- G4a1104 2004 johnson j50plsrs 50 hp cover & plug assy water passage pn 0437506(US $25.00)
- G3a1095 2004 johnson j50plsrs 50 hp crankcase with bolts pn 0437341 fits 95-2005(US $300.00)
- G3a1096 2004 johnson j50plsrs 50 hp crankshaft assembly pn 0439939 fits 99-2005(US $300.00)
- G3a1099 2004 johnson j50plsrs 50 hp intake manifold pn 0391780 fits 1981-2005(US $65.00)
- G3a1098 2004 johnson j50plsrs 50 hp flywheel pn 0585190 fits 1994-2005(US $75.00)
- G4a1105 2004 johnson j50plsrs 50 hp crankcase head fits 1999-2005 pn 0439210(US $25.00)
BMW ActiveE: Electric BMW 1-Series at Geneva
Thu, 10 Feb 2011BMW 1-Series Electric - BMW ActiveE It’s been a while since we first saw the BMW ActiveE, the BMW 1-Series with the gubbins from the MINI E bolted under the bonnet (and various other places) and intended as the next instalment in BMW’s plans to charge its customers to do real-world development and research. In fact, the electric BMW 1-Series first crossed our radar in December 2009 and went on to be shown as a concept at the Detroit Motor Show a month later. And now it’s back at the Geneva Motor Show in March, only now it’s production-ready.
Smart parking needed to help drivers
Fri, 04 Apr 2014SMART parking is needed to help relieve congestion in cities and help reduced stress levels for drivers to improve their health. This is the conclusion of a report into the difficulties facing urban drivers. Conducted by Dr Therese Cory, the report says parking has become one of the biggest frustrations for drivers in towns and cities.
$5 billion competition on to replace Humvee
Mon, 04 Jun 2012Competition is heating up to win a contract for a vehicle that will replace nearly 18,500 aging military Humvees for the U.S. Army and Marine Corps starting in 2015. Six proposals are in play, with little time left before federal contracting officials decide on development of the $5 billion-plus program.