2001-2008 Suzuki Rm250 Seat Cover Yellow And Black Grabber With Ribbs on 2040-parts.com
Auburn, Washington, US
2001-2008 suzuki rm 250 seat covers made with marine vinyl. black grabber insert with ribbs and yellow boxing. made to slip right on. very little stretching to make it tight. we ship next business day.
Seats for Sale
- Harley davidson studded backrest part #52709-97c(US $49.99)
- Cafe racer motorcycle seat pad foam cusion honda cb750 cb550 cb500 cb350 xs650 (US $39.99)
- Harley davidson '93-06 fat boy / heritage / fatboy / softail driver backrest(US $68.00)
- Mustang riders backrest with black pearl studs.(US $30.00)
- Well used corbin 284 harley davidson black flame stitching double padded seat(US $199.00)
- New kawasaki zx6r zx-6r 2009 2010 rear passenger seat pillion motorcycle motor(US $24.99)
Geely to enter to US market with help from Volvo
Mon, 26 Aug 2013Geely Automobile Holdings told reporters in Hong Kong on Aug. 23 that it plans to start exporting cars to the United States with help from Volvo. Geely is hoping the Swedish company’s reputation will help it succeed in new markets after the firm stumbled on its first trip to the States at the Detroit auto show in 2006.
Audi R8 e-Tron WILL go in to production & get 280 mile range
Wed, 12 Mar 2014The Audi R8 e-Tron (pictured) is going in to limited production. Audi has been playing with the electric R8 e-Tron for the last five years, with a constant on and off for production. But it seems the R8 e-Tron is going in to production after all.
Saab enters Court Protection – just as we predicted
Wed, 07 Sep 2011Victor Muller takes Saab in to Court Protection Two weeks ago we reported that Saab were about to seek court protection from its creditors in a bid to buy time until investment from China arrives. And that’s exactly what’s happening. Saab are waiting for investment funding from China – via Pang Da and Youngman – totalling €245 million which should put Saab back on a solvent footing – at least for a while – and allow the beleaguered Swedish car maker to resume production and push on with future plans.