2001 Arctic Cat Mc 800 Spark Ignition Igniter Cz50 Shelf#102 on 2040-parts.com
UT, United States
Shocks & Suspension for Sale
- Spi left side upper a-arm for arctic cat snow replaces oem# 2703-787 & 2703-957(US $84.95)
- Spi right side upper a-arm fits polaris many 2012-2016 snow replaces oem 2204666(US $89.95)
- Spi right side upper a-arm fits arctic cat snowmobiles replaces oem# 3703-276(US $99.95)
- Spi a-arm brace kit for ski-doo fits 2017-2020 850 etec rev gen4 models g4(US $84.95)
- Genuine oem honda 90305-hc0-770 self locking nut a20(US $7.50)
- Polaris 7061055 left hand 3/8 tie rod end 2000-2008 rmk switchback classic 900(US $34.99)
Daimler takes 10 percent stake in EV maker Tesla
Tue, 19 May 2009Daimler AG has acquired an equity stake of nearly 10 percent of California electric car maker Tesla Motors Inc., the German automaker said Tuesday. The two companies have been working together to integrate Tesla's lithium-ion battery packs and charging electronics into the first 1,000 units of Daimler's electric Smart car. Daimler said its stake in Tesla will allow the companies to collaborate even more closely on the development of battery systems, electric drive systems and in individual vehicle projects.
Mercedes SLK (2011): new roadster revealed
Thu, 13 Jan 2011This is the new Mercedes SLK, the third-generation version of Merc’s folding metal roof-equipped roadster. Rather than forcing the new Mercedes SLK to share the limelight with the facelifted C-class at the 2011 Detroit motor show, Merc has revealed the all-new SLK a few days after this year’s NAIAS started. Let’s start with the looks, and this latest SLK has adopted the latest Mercedes DNA from the CLS and SLS.
Workers misspell 'bus' on road markings
Tue, 26 Aug 2014WORKMEN have given road users something to chuckle about by misspelling the word 'bus' during roadworks. "Bup stop" was painted on to the road surface in Bristol in large yellow lettering at the end of last week, with the stencilled letter P used instead of S. The mistake was made as part of road repairs which are likely to last up to four weeks in the Old Market area of the city centre.