2002-2005 Honda Civic Si (3-door) Rockford Fosgate (4) 6.5" Speaker Replacements on 2040-parts.com
Inwood, New York, United States
Speakers & Speaker Systems for Sale
- 2 new cadillac grills(US $125.00)
- 2008 2009 2010 2011 2012 scion xb xd front door speaker oem 86160-33620(US $29.99)
- 1pcs 3" inch 4ohm 4Ω 30w crystal subwoofer speaker loudspeaker for harman
- 2001-2005 honda civic rockford fosgate 6.5" door+panel speaker replacement kit(US $109.95)
- 01 02 03 04 05 06 acura mdx rear trunk subwoofer speaker 39120-s3v-a61(US $40.00)
- 2005 honda civic se rockford fosgate 6.5" door+panel speaker replacement kit(US $109.95)
Volvo confirms big production increase for V60 Plug-in Hybrid
Fri, 17 May 2013Volvo has been building around 150 V60 Plug-ins a week at its facility in Torslanda – alongside the regular V60, V70, S80 and XC90 – but that is now set to be upped to 282 cars a week for the rest of 2013, with plans to build at least 10,000 in 2014. The fact is that the V60 is a very appealing estate car already, and bolting a plug-in hybrid setup has turned it in to a big hit in showrooms because the barking mad official economy and emissions system bestows the V60 plug-in with emissions of just 48g/km, making it a real no-brainer in countries where governments blindly tax cars based on their official emissions. That means countries like Holland, where Volvo has received more than 3,000 orders for the V60 Plug-in, and the UK are lapping up the hybrid offering from Volvo as a way to escape big taxes and still have a swift (0-62mph in 6.1 seconds), appealing and stylish car.
Trademark filing suggests Infiniti plans ‘performance line'
Tue, 25 May 2010Nissan North America Inc. has taken legal steps to create a performance segment for its Infiniti Division product line, similar to its larger luxury rivals Mercedes-Benz and BMW. Nissan has filed for trademark protection for the names “IPL” and “Infiniti Performance Line,” according to documents on file with the U.S.
July 9: Keeping it topped off
Fri, 09 Jul 2010As expected, when I walked back to my parking space at VSP parking across the street from Burbank Airport the i-MiEV was fully charged. No problem. It had more than 24 hours to get charged and it can't take more than 16 hours to do it, if you figure one hour per kWh at 120 volts.