2002-2009 Chrysler Dodge Neon Knuckle Front Left Suspension Oem 04656939ab on 2040-parts.com
Karlstad, Minnesota, US
Shocks & Struts for Sale
- 02 jaguar x type shock absorber l=r,1x43 18080af(US $45.00)
- 2002-2009 chrysler dodge neon knuckle front right suspension oem 05272486ab(US $69.99)
- 2003-2005 dodge neon strut left rear suspension oem 05290183aa(US $59.99)
- 2003-2005 dodge neon strut right rear suspension oem 05290182aa(US $59.99)
- Hellwig 2-spring set helper spring new chevy full size truck chevrolet gmc 2515(US $229.36)
- Monroe shock absorber front new blue f250 truck ford f-250 79 78 77 76 32286(US $36.80)
New BMW 1-series bows with turbo four-cylinder power across the lineup
Mon, 06 Jun 2011Meet the next-generation BMW 1-series. The upcoming baby Bimmer will sport all twin-scroll turbocharged four-cylinder engines burning either gasoline or diesel, hauling around a car that's grown in every dimension except height. BMW also is expanding its use of eight-speed automatic transmissions to the 1-series lineup and making the BMW EfficientDynamics technology package standard.
Ford Evos concept
Wed, 31 Aug 2011Ford's new Evos concept will make its global debut at the 2011 Frankfurt motor show, showcasing the manufacturer's new One Ford design direction as well as exploring future powertrain and vehicle technologies. The four-door, four-seat fastback concept with a lithium-ion plug-in hybrid powertrain, is designed to engage the driver as much as possible through the use of infotainment and wireless technology. Although the car will never be seen on the roads, Ford has claimed that it contains many of the features that will be in use within future Ford production models.
Call for reform over road repair funding
Fri, 06 Jun 2014FUNDING patterns mean most road maintenance is being carried out in "less-efficient, cold and wet" times, a report from a Government spending watchdog has said. The current pattern of funding, combined with the need to spend money within the financial year, means that most maintenance work goes on between September and March, said the report from the National Audit Office (NAO). It went on: "Although this is less disruptive for road users, it is less efficient than carrying out the work at other times of year because materials can be more difficult to handle in cold and wet conditions, and daylight hours are shorter." The report went on: "As a result of the additional funding for emergency repairs, which is made available at the end of the financial year, almost all highways authorities need extra capacity from the market at the same time, which makes it less likely that they will get value for money." The NAO report said there was a "lack of predictability" over road spending adding that historically, local highway authorities spent more revenue on maintenance, but were now carrying out fewer routine activities such as clearing gullies which are essential to preventing water seeping into roads' sub-structure.