Find or Sell any Parts for Your Vehicle in USA

2002 Lincoln Ls Steering Column Switch Memory Package Moisture Sensing Wiper on 2040-parts.com

US $77.39
Location:

Sugar Land, Texas, US

Sugar Land, Texas, US
Returns Accepted:Returns Accepted Refund will be given as:Money Back Item must be returned within:14 Days Return policy details:BUYER MUST PAY FOR SHIPPING BOTH WAYS. NO RETURN AFTER 14 DAYS OF PURCHASE. Return shipping will be paid by:Buyer Restocking Fee:No Inventory ID:1154 Interchange Part Number:629-00321B Year:2000 Model:LINCOLN LS Stock Number:25847 Brand:LINCOLN Part Number:1154

KRAZY PARTS

Customer Service

281-503-7004

Mon - Sat  9:00am - 5:00pm CST

 

 You Are Buying a Quality Used: Column Switch

 

COMPATIBILITY & FITMENT

Parts are only guaranteed to work in vehicles mentioned in "Item Condition" or "This Part May Also Fit" sections.

Compatibility interchange information is not guaranteed to be exact. Please contact us before buying.

 

Donor Vehicle

Year 2000
Make & Model LINCOLN LS
Stock# 25847
Placement

Item Condition

00-02 LINCOLN LS STEERING COLUMN SWITCH MEMORY PACKAGE MOISTURE SENSING WIPER

 

OEM Part Number

This part may also fit

LINCOLN LS 02 Turn/wiper assm; from 11/08/01, (memory pkg), w/moisture sensor wipers

PLEASE NOTE

RETURNS

SHIPPING

1. This is a used part. It will show signs of wear such as scuffs and scratches.

2. Used computer modules may require programming to work properly.

3. Please match part numbers before buying.

4. Radios do not come with security codes unless listed in description.

5. Bulbs are not included in the sale. If you receive one, it is not guaranteed to work.

6. All trims & parts are sold without clips & mounting hardware.

7. "Damaged" or "Parts only" items are sold AS-IS. No return or refund for such purchases.

 

We accept returns within 14 days of sale.

Returned item must be in original condition as it was shipped.

Warranty voided if hologram stickers or watermarks have been altered or removed.

Buyer MUST pay for shipping BOTH WAYS.

Refund will be issued through paypal after deducting original shipping charges.

Free shipping is only valid when buyer keeps the item.

Expedited shipping option includes insurance.


 

1. Shipping will take 5-8 business days.

2. Expedited shipping takes 3-5 business days.

3. Expedited shipping for small packages weighing less than 10 lbs and measuring less than 15x15x15 inches is $12.

4. Heavy and large items cannot be sent through expedited shipping.

5. All heavy and/or large items will be sent via truck freight service.

Business/ Commercial address & working Phone number is required for Heavy & Large item shipments OR can be picked up at truck terminals.

 

Actual Item Pictures

 

 

 

 




Powered by eBay Blackthorne 04.08.033

Fancy being the new Jeremy Clarkson?

Fri, 03 Jul 2009

VW are running a competition to find the best 'Peoples Reviewer' - The next JC? (image copyright Top Gear) But Cars UK aren’t looking for car testers at the moment (although you will be able to submit guest reviews on your car before long), but Volkswagen are – for the new VW Tiguan. They’re running a competition to find the best amateur car reviewer in the UK, which we find quite fascinating.

Subaru WRX and Legacy Concept at Los Angeles Motor Show 2013

Thu, 21 Nov 2013

Microsoft Subaru unveiled a pair of newcomers at the 2013 Los Angeles Motor Show - a red-hot WRX fast saloon (above) and a concept car depicting the next Legacy (below). The WRX is a Subaru performance icon, but has been around the block a few times in recent years. First it was a four-door blue and gold rally hero, then it became a sensible hatchback.

BID TO SLOW TRAFFIC ON M3 STRETCH

Fri, 14 Feb 2014

FIRST it was a stretch of the M1 and now the same speed reduction plan has been announced for a stretch of the M3 motorway in Surrey and Hampshire. The Highways Agency (HA) has proposed that a three-mile section of the M3 between junction 3 at Lightwater in Surrey and junction 4 near Farnborough in Hampshire be subject to a 60mph restriction. This section is part of a 13.4-mile stretch that is being upgraded in a £174 million scheme, with the 60mph proposal, to operate between 7am and 7pm daily so air quality levels can be met.