Find or Sell any Parts for Your Vehicle in USA

2004 Kawasaki Ninja 250r Rear Foot Rest / Foot Peg Assembly on 2040-parts.com

US $25.00
Location:

Gurnee, Illinois, US

Gurnee, Illinois, US
Item must be returned within:14 Days Refund will be given as:Money Back Return shipping will be paid by:Buyer Restocking Fee:20% Return policy details: Returns Accepted:Returns Accepted Part Brand:Kawasaki Surface Finish:Used Warranty:No Country of Manufacture:Japan

2004 Kawasaki Ninja 250R

USED OEM Kawasaki Rear Foot Rest / Foot Peg Assembly

  The item may have some signs of cosmetic wear, but is fully operational and functions as intended.

FREE SHIPPING!

2013 Aston Martin Vanquish UK Tour

Tue, 11 Sep 2012

Aston Martin have embarked on a tour of its UK dealers with the new Vanquish to show its latest supercar to both dealers and customers. The new Aston Martin Vanquish – successor to the DBS and first shown at Villa D’Este earlier this years as the AM 310 – was revealed back in June. But with a public debut at the Paris Motor Show in just a few week’s time, Aston Martin has been ramping up the PR for the new Vanquish with new photos and new video in the last week, and now they’re off to show the Vanquish to dealers and the Aston Martin faithful alike.

Canadian Grand Prix (2012) RESULT

Mon, 11 Jun 2012

A Red Bull on pole with Sebastian Vettel and a McLaren alongside with Lewis Hamilton. Will we get the seventh winner of 2012 in Montreal? The 2012 Canadian Grand Prix at the Giles Villeneuve Circuit in Montreal looked a bit like 2011 at the front, with Sebastian Vettel’s Red Bull on pole.

Peugeot Citroen idles Slovak factory over falling orders

Thu, 20 Oct 2011

PSA to halt production of 207 & C3 Picasso in Slovakia The news that Peugeot Citroen (PSA) is to suspend production at its factory in Trnava, Western Slovakia, as orders for cars fall away, is another sign of the impending gloom in the Euro zone car industry. PSA has revealed that the Trnava factory – which produces the Peugeot 207 and Citroen C3 Picasso – will be shut from October 28th to November 18th (a period which does include two bank holidays) as orders start to fall away and production exceeds demand. But this announcement seems to be the tip of the iceberg for PSA’s factory closures.