2006 Honda Ridgeline Climate Control Temperature Switch on 2040-parts.com
Gaylord, Michigan, US
2006 Honda Ridgeline FOR PARTS This listing is for the climate control temperature switch only. Let me know what parts your are looking for as I am parting out the entire vehical. Please ASK QUESTIONS BEFORE BIDDING
Switches / Controls for Sale
- Mopar oem dodge truck lil red express windshield wiper switch ramcharger m880(US $12.49)
- Saab emblem " saab " black disc w/ tab(US $19.88)
- Cadillac seville 93-96 1993-1996 power door lock switch & larger bezel passenger(US $29.88)
- Chrysler sebring convertible 96-00 1996-2000 power door mirror switch green(US $27.88)
- Volvo 240 88 1988 seat heat seat heater switch oe # 12 58 502 1258502(US $24.88)
- Saab 9-5 saab 9 5 1999-2009 seat heater switch oe # 46 16 108 oe # 54 71 024(US $49.88)
Car Design of the Year Awards 2008
Thu, 12 Feb 2009Last year we asked you, our loyal readers, to choose your favorite automobile design from a shortlisted selection of 10 production and 10 concept cars unveiled in 2008, and in the process find our Car Design of the Year (CDOTY). Well, we asked and you answered. The survey was completed by over 1000 readers and the votes have now been tallied.
2010 Lincoln MKZ gets more power, noise insulation
Wed, 18 Mar 2009For 2010, Lincoln hopes to lure more entry midsize-luxury shoppers to its fold with increased optional content and improved performance in the revised MKZ. The 3.5-liter V6 is unchanged with its 263 hp, but the six-speed automatic transmission with manually selectable gears is new. Thanks to lower early gears, the '10 MKZ slashes its 0-to-60-mph time from 7.7 seconds to 7.1 seconds over the outgoing model.
TFL to get more poweres over roads
Wed, 27 Nov 2013GREATER POWERS will be given to Transport for London to enforce road alterations after legislation finally cleared parliament. TfL and London borough councils will also be able to ensure builders' skips are properly lit and make developers pay for any damage they cause to roads or footpaths. But the changes, contained in the London Local Authorities and Transport for London (No.2) Bill, have taken exactly six years to pass through parliament.