2007-2008 Aston Martin V8 Vantage 19" Front Rims Wheels on 2040-parts.com
Orlando, Florida, US
Very good condition, shows almost no signs of wear as seen in pictures. Pictures are of actual rim.
Wheels for Sale
- Bmw 5 series oem rims & tires. fits 06-10 years(US $900.00)
- Ferrari 348 355 19" / wheels & tires(US $1,500.00)
- 24" milanni kool whip 8/ 8x6.5 yukon xl 2500 suburban sierra yukon chrome wheels(US $1,520.00)
- (4) azev type h 17''wheels (no reserve)(US $200.00)
- Bmw oem x6 style 214 wheels new staggered(US $1,500.00)
- Roadster wire wheel 13 x 7" rev.100 spoke chrome straight-lace lowrider 14"(US $269.00)
Tesla pays off its government loans
Thu, 23 May 2013Tesla paid off the last of its $465 million government loans May 22, nine years ahead of schedule, thus outperforming most U.S. college graduates and the vast majority of American homeowners. Tesla used funds from a stock offering to finish the loan with a whopping bank transfer of $451.8 million Wednesday, pointing out that it was “…the only American car company to have fully repaid the government.” Apparently no one at Tesla was even born when Lee Iacocca paid off Chrysler's $1.2-billion government bailout ahead of schedule back in 1983.
Hyundai ix35 FCEV completes record distance on a tank of hydrogen
Fri, 11 Jul 2014The Hyundai ix35 FCEV completes record distance on a tank of hydrogen Now the Hyundai ix35 FCEV (the hydrogen-powered version of Hyundai’s iz35) is starting to move out in to the real world (in a small way) Hyundai are keen to shout about its abilities. And perhaps its greatest ability is to do everything an ICE-powered ix35 can do, but doing it using hydrogen to create electricity to power the IX35′ electric motors, but do that in a way that creates a car with the same sort of range as an ICE car and the ability to refuel in a very similar way, and in a very similar time. So Hyundai decided to fill the tank up on an ix35 FCEV in Oslo and head off to Copenhagen to see if they could do it without needing to fill up.
Nissan may build more Leaf EVs to meet growing demand
Wed, 07 Aug 2013Nissan is making plans to begin building more electric Leafs as dealers clamor for more of the once slow-selling car. The automaker's North American factory chief -- who has been visiting with retailers in recent days -- cautions that production will move ahead in small and careful steps. But Nissan is already taking measures to increase its output of electric motors from its engine factory in Decherd, Tenn., says Bill Krueger, Nissan Americas vice chairman and senior vice president for manufacturing, purchasing production engineering and supply chain management.