2007-2011 Toyota Yaris Sedan Front Bumper Cover Mounting Bracket Right Support on 2040-parts.com
Best Price! Shop here!, US
Bumpers for Sale
- Dodge viper front bumper 99 00 01 02 gen 2(US $75.00)
- Front bumper trim molding insert right passenger 1999-2002 chevy silverado ls lt(US $15.37)
- Front bumper reinforcement primed steel impact bar 2004-2008 acura tl ac1106131(US $77.61)
- 2005 2006 2007 2008 2009 ford mustang gt v8 roush front bumper cover white #2(US $345.00)
- 2005 2006 2007 2008 2009 ford mustang gt v8 roush front bumper cover white #1(US $345.00)
- Rear bumper cover ni1100208 unprimed 1996-1998 nissan pathfinder wo tire carrier(US $251.93)
Kia shows off rear-drive Stinger again before Detroit auto show
Thu, 09 Jan 2014Kia dropped another teaser shot of its GT4 Stinger, headed for the Detroit auto show next week. It's an overhead view, giving us a good look at the fender flares. The GT4 will house a 2.0-liter turbocharged, direct injected four-cylinder, which delivers 315 hp.
TWO Koenigsegg One:1 on video at Goodwood
Fri, 27 Jun 2014Both Koenigsegg One:1s on video at Goodwood As we’ve already reported, the Koenigsegg One:1 is debuting at the Goodwood Festival of Speed this weekend, but rather than a single One:1, Koenigsegg have taken the only two One:1s in existence – yes, it’s two for the price of one at Goodwood. One car – the black one in the photo above – is a new One:1 heading for a customer, but the second (the silver can in the photo and video) is Koenigsegg’s development car, so that’s up for a bit of action on the hillclimb this weekend. But ahead of its public appearance, Goodwood managed to get some time with the One:1s and grab track time behind the wheel.
BID TO SLOW TRAFFIC ON M3 STRETCH
Fri, 14 Feb 2014FIRST it was a stretch of the M1 and now the same speed reduction plan has been announced for a stretch of the M3 motorway in Surrey and Hampshire. The Highways Agency (HA) has proposed that a three-mile section of the M3 between junction 3 at Lightwater in Surrey and junction 4 near Farnborough in Hampshire be subject to a 60mph restriction. This section is part of a 13.4-mile stretch that is being upgraded in a £174 million scheme, with the 60mph proposal, to operate between 7am and 7pm daily so air quality levels can be met.