2pcs Exhaust Elbow Riser Gasket Dry Joint For Mercruiser 27-864850a02 on 2040-parts.com
Shenzhen, China
Exhaust System for Sale
- 2pcs exhaust manifold elbow riser gasket dry joint 27-864850a02,27-864850(US $48.99)
- 2pcs exhaust manifold elbow riser gasket dry joint fit mercruiser v6 v8 5.7l(US $59.00)
- 2-pack restricted flow gasket for mercruiser dry-joint manifolds 27-864547a02 .(US $59.97)
- 2-pack restricted flow gasket for mercruiser dry-joint manifolds 27-864547a02 /(US $59.96)
- Mercruiser y pipe exhaust pipe 4.3 5.0 5.7 v6 v8 807384 freshwater part(US $120.00)
- Mercury marine mercruiser quicksilver trim limit spacer kit bravo pn 23-806445a1(US $15.95)
Owners claim Ford V6 EcoBoost engine defects
Thu, 16 May 2013Ford Motor Co. is being sued by three vehicle owners in Ohio because of alleged defects in the automaker's six-cylinder EcoBoost engine. According to the lawsuit, the 3.5-liter V6 EcoBoost engine "contained serious latent design, manufacturing, or assembly defects" that cause vehicles to shake, misfire and rapidly lose power.
Fiesta ST Concept (2012 / 2013) to show at Frankfurt
Sat, 10 Sep 2011Ford Fiesta ST - expected at Frankfurt There was a time when it seemed likely Ford would abandon all plans for a hot Fiesta. They seemed convinced that a Fiesta ST would be anathema in our seemingly eco-obsessed times, but fortunately they’ve had a change of heart. We reported back in September 2010 – after we had spy shots of what appeared to be the new Fiesta ST – that Ford were planning to cash-in on their WRC Fiest profile to finally bring us a Fiesta with a bit more get-up-and-go than the Zetec S could manage.
First sight of Pininfarina-designed Eurostar trains
Fri, 19 Oct 2012Eurostar has unveiled the first images of its new Pininfarina-designed e320 trains that are currently under construction in Germany. A £700m overhaul of the Eurostar fleet has seen a refurbishment of its existing trains as well as the purchase of 10 new trains designed by the Italian design house. The entire new Eurostar fleet should be completed by 2015 with production of the new e320 trains and refurbishment of the existing trains well underway.