3 Units. Timbren Suspension .fr250sdf. New.ford F250 on 2040-parts.com
Long Beach, California, United States
TIMBREN
Suspension Enhancement System Model-FR250SDF 3 units, Customer pay shipping Big Exporter AVI 310-901-0697 |
Lift Kits & Parts for Sale
- Steering box stabilizer bar for 03-08 dodge ram 1500 2500 3500 4wd 5.9 6.7l 8.0l
- 1994-2013, dodge ram 1500/2500/3500 4wd 2" rear lift block & u-bolt kit(US $79.00)
- Dodge ram rough terrain 2500/3500 4wd 1994-2013 2" rear lift block & u-bolt kit(US $79.00)
- 2014-2016 chevy/gm silverado 5' suspension lift kit 4wd(US $969.92)
- Tuff country 61181 sx8000 shock absorbers pair of 2(US $50.00)
- 66-1090 ready lift kit(US $132.99)
Frankfurt Motor Show 2013 – Trends and Overview
Mon, 30 Sep 2013The bi-annual Frankfurt motor show is always an exhibition of Germanic industrial might – for better or worse – and 2013 was no exception. Despite news of flat-lining car sales across Europe, the show was one of the defiant rolling out of new models. The number of production cars and production previews of cars that would be appearing in (presumably quiet) showrooms soon was impressive.
General Motors is looking at ways to double or triple Volt production
Wed, 01 Dec 2010General Motors Co. CEO Dan Akerson says the carmaker is studying how it could double or triple production of the new Chevrolet Volt plug-in hybrid should sales demand accelerate. About 240,000 potential buyers have expressed an interest in the vehicle, but production in 2011 will be just 10,000 units.
Bid to cut car insurance premiums
Thu, 12 Jun 2014THE COMPETITION WATCHDOG is proposing to impose a cap on replacement vehicle costs following motor accidents as part of a clampdown to help cut premiums for all drivers in the £11 billion private motor insurance market. The Competition and Markets Authority (CMA) said the cap on charges passed to the insurer of the driver who is at-fault in an accident for the cost of providing a replacement vehicle to the non-fault driver, would "more closely reflect the costs incurred and remove significant inefficiencies". The watchdog has previously found that the "complex chain" of claim costs following an accident collectively inflates premiums by as much as £200 million a year.