350 327 305 265 Chevrolet Timing Cover Factory Cover on 2040-parts.com
Prior Lake, Minnesota, United States
350 327 305 265 Chevrolet Timing cover Factory cover with Nice shape I ship fast same or next business day. Thanks for looking and have a great day |
Timing Components for Sale
- Vintage 1960's 1970's sb chevrolet timing chain cover 283 327 350
- Pontiac timing cover 9796346 1969 70 firebird, trans am, gto 350, 400, 428,455(US $85.69)
- 37-50 chevrolet fibre camshaft timing gear nos 838436(US $74.99)
- 1958 1959 1960 1961 1962 chevrolet 283 v-8 delco distributor(US $40.00)
- Timing pointer 1969-1970 428 super cobra jet drag pack mustang shelby cougar(US $49.95)
- 1967 corvette 1111247 distributor survivor 427 390/400 hp 6m27 date(US $1,095.99)
Caterham R300 Superlight unveiled
Tue, 28 Oct 2008By Ben Pulman First Official Pictures 28 October 2008 10:30 Caterham has released its latest Superlight Seven model, the R300. Powered by a 2.0-litre Ford Duratec engine, tweaked by Caterham Powertrain to produce 175bhp, the new R300 will sprint to 60mph in 4.5 seconds. The new R300 weighs a mere 515kg, just 15kg more than CAR’s long-term 1.6-litre Superlight. Combined with the new 175bhp engine, the R300 has a power-to-weight ratio of 339bhp-per-tonne – a Porsche 911 Carrera S has a mere 270 by comparison.
Rolls Royce Phantom Facelift: Geneva 2012
Tue, 06 Mar 20122012 Rolls Royce Phantom Series II - the whole range gets a facelift The Rolls Royce Phantom Series II Facelift has been revealed at the Geneva Motor Show across the entire Phantom range. In showrooms June 2012. It would be quite hard to work out what Goodwood has done to the Rolls Royce Phantom to give it a facelift for 2012, despite which it is the most comprehensive raft of changes to RR’s flagship since the Phantom launched almost a decade ago, to create the Rolls Royce Phantom Series II.
Call over winter transport issues
Fri, 03 Jan 2014MORE MUST BE DONE to enable transport systems to cope with bad winter weather, a report by MPs said today. Recent floods and gales showed that disruption was not just caused by snow, the report by the House of Commons Transport Committee said. Transport's winter resilience had improved but there was a risk that a few years of mild winter weather "could lead to a false sense of security and reduce the sector's preparedness over the longer term", the report said.