55 56 Chevy Bel Air Deluxe Heater Control 210 Nomad Original Lower Levers Nice on 2040-parts.com
Mesa, Arizona, US
Other for Sale
- 1973-1977 ford maverick mercury comet air conditioning ac dash ducts & hoses (US $9.90)
- 74-78 ford granada mercury monarch turn signal multi function delay wiper switch(US $24.90)
- 1964 ford galaxie 500 interior parts(US $20.00)
- Oem mg mgb gt british leyland inside right door handle latch assembly - vg used(US $27.00)
- 1957 to 1960 ford f-100 to f-350 fresh air vent door/ lovered trim left side(US $37.95)
- 67 chevelle malibu glove box plate bezel(US $50.00)
Tesla has room to grow with the Model S sedan, Calif. factory
Tue, 04 Oct 2011We got a brief ride in a prototype of the Tesla Model S all-electric sedan, and as far as we could tell from the passenger seat, it seemed like a luxury performance bargain for just $57,400. Of course, being just a passenger means any evaluation is more or less just a guess. We should get to drive one of them sometime before the fully finished models go on sale next summer and then we will have a more definitive take on the car.
Who's Where: Gordon Murray launches own design company
Wed, 11 Jul 2007Famed Formula One designer Gordon Murray has launched his own design company, with its first project currently underway. But it's not quite what you might expect from someone who's made a name for himself building such aerodynamic performers like the McLaren F1 and Camparo T1 supercars. Murray's new project is to build an economical small car for the masses: one that would be both cheap to buy and to run.
GM to double size of battery lab
Mon, 12 Apr 2010General Motors says it will spend $8 million to double the size of its Global Battery Systems Lab, which the company claims is the largest and most technologically advanced automotive battery lab in the United States. GM says the expansion will speed up the development of hybrid and electric vehicles, such as the upcoming Chevrolet Volt, by improving on-site testing of battery cells and systems. When finished, the lab will be 30,000 square feet bigger than it is now, for a 63,000-square-foot total.