61514-68l00-000 Suzuki Extension,rr Floor Side,r 6151468l00000, New Genuine Oem on 2040-parts.com
Tokyo, Japan
Engine Services for Sale
- 87131-51k00-000 suzuki spring,rr cush no.1 8713151k00000, new genuine oem part(US $14.61)
- 87480-57l00-5pk suzuki knob,rr back lock,r 8748057l005pk, new genuine oem part(US $52.27)
- 15734-89l00-000 suzuki spacer,delivery pipe 1573489l00000, new genuine oem part(US $28.73)
- 66330-58h00-000 suzuki fender,deck rr rr,r 6633058h00000, new genuine oem part(US $138.67)
- Dmi src-3000 sprint car engine rotator tool(US $495.99)
- 54750-31f00-000 suzuki spacer,fr axle,l 5475031f00000, new genuine oem part(US $20.99)
Skoda Yeti stars at the 2013 Frankfurt Motor Show
Wed, 11 Sep 2013Is there an award Skoda hasn't won recently? The rate the Czech brand is going, there'll be a special ceremony at Frankfurt 2013 to give Skoda an award for picking up the most awards. In the meantime, we can bring you news of a fresh face for the Skoda Yeti.
Dramatic CCTV footage shows consequences of tyre failure
Wed, 23 Oct 2013AS A PART of October's Tyre Safety Month initiative the Highways Agency have released dramatic footage of the consequences of tyre failure. In the clip, viewable on the Highways Agency YouTube channel, motorway cameras capture the moment a front tyre explodes on a large lorry, sending it out of control and into the central reservation in a spectacular crash. Further clips show the chaos caused when all three lanes of a motorway are closed to retrieve tyre debris, and the eye-watering £2 million cost of a lorry fire caused by tyre failure results in all six lanes of a motorway being shut for hours.
SEASONAL PRESSURES SEE MARKET SLOW IN JULY
Thu, 10 Oct 2013AUCTION house BCA’s latest Pulse report shows that demand for older, lower value dealer part-exchange cars improved in July, but the fleet and lease sector has experienced more price pressure. The headline average used car value declined in July, as would typically be expected at the onset of the summer holiday months. Values across the board fell to £5,633 down from the £5,662 recorded in June – a £29 decrease that was equivalent to 0.5% fall.