70 71 72 Corvette Lt1 Camaro Z28 Water Outlet Correct Original 3972128 on 2040-parts.com
Williamstown, New Jersey, United States
please see pic for condition, has two minor nick in it which are hard to see in picture
|
Cooling System for Sale
- Ford gpw water neck(US $45.00)
- Mercedes w107 fan shroud 380sl 380slc 81-85 1075050755(US $169.00)
- Ford mercury 302 351m 351c 400 heater hose to block fitting 3/4" tube 6601579(US $14.99)
- Mercedes w107 behr fan shroud 450sl 450slc 1075050255(US $139.00)
- Mercedes w107 behr euro fan shroud 380sl 380slc 10750502655(US $99.00)
- Chevy water pump 3782608 608 no date gm 6(US $50.00)
RCA students to reinterpret classic cars for Salon Privé
Thu, 06 Jun 2013Salon Privé is the rather pretentious-sounding UK concours d'elégance that models itself on the likes of Pebble Beach and Villa d'Este. This year the event has something that really piques our interest – a design contest, judged by some of the world's top designers. Ten Students from the nearby Royal College of Art have been tasked with reinterpreting a previous cars entered into the show for a competition named Concours of the Future.
‘Nemesis’ breaks UK electric car speed record
Sat, 29 Sep 2012An electric car – based on a second-hand Lotus Exige – has broken the UK electric car speed record with a speed of 151.6mph. We’re not entirely sure how relevant a new UK speed record for an electric car is, but let’s be parochial and report it anyway. The ‘Nemesis’ is an electric car built round a second hand Lotus Exige, bought off eBay, by a team of engineers in a shed in Norfolk and driven by an Estate Agent from Gloucestershire.
Camaro plant gets more work; recall issued
Thu, 07 May 2009The strong early demand for the Chevrolet Camaro has General Motors looking to crank more units out of the Oshawa, Ontario, assembly plant. The Oshawa plant was exempt from GM's recent announcement of shutdowns of as long as nine weeks for several of its plants--primarily those that build pickups and SUVs. Oshawa will increase Camaro output by adding overtime and an extra week to the plant's production schedule.