91-93 Regal Coupe 2 Door Radiator 3.1l V6 on 2040-parts.com
South Plainfield, New Jersey, US
Radiators & Parts for Sale
- 2007-2009 chrysler sebring 2.4l l4/2.7l/3.5l aluminum core radiator replacement(US $57.79)
- 1983 1984 lebaron radiator support panel reliant aries 400 600 primed wo tie bar(US $127.94)
- New cooling radiator replacement assembly 1998-2005 bmw 3 series 320/323/330 a/t(US $62.47)
- 2002-2009 dodge ram 1500 3.7l 4.7l 5.9l v6 v8 gas ohv aluminum radiator pickup (US $77.19)
- Beck arnley 147-0039 cooling system misc-engine coolant hose c-clip retainer(US $10.98)
- 1997-1998 ford f-150 new 5.4l v8 2 row a/t cooling radiator replacement assembly(US $137.27)
Dodge Charger
Mon, 22 Nov 2010The new Dodge Charger is longer, lower and wider than the model it replaces, but offers even more performance from its 5.7-liter Hemi V8, which now belts out 470bhp and the standard 2.7-liter Pentastar V6 also offers 292bhp and better economy. Although based on the previous models' platform, the car has been significantly reworked to enhance its driving dynamics with all-new suspension settings, but it also wears bolder sheet-metal. The interior, benchmarked against European models, features soft touch plastics, a single piece molding for the dash and better colors throughout the range.
Who's Where: Robin Page joins Volvo Cars as interior design director
Tue, 12 Mar 2013Robin Page has joined Volvo Cars as design director interior. He will report directly to Thomas Ingenlath, Volvo's vice president of Design. 41-year-old Page, formerly head of interior design at Bentley since 2001, was responsible for the Continental and Mulsanne ranges' interiors and also designed the interior of Queen Elizabeth II's State Limousine. He previously undertook an apprenticeship with Jaguar and has also worked for Rolls-Royce and Bugatti.
Jaguar Land Rover installs UK's largest solar roof
Tue, 08 Apr 2014THE LARGEST EVER solar panel roof has been completed at the Jaguar Land Rover (JLR) engine factory in South Staffordshire. More than 21,000 solar cells have been fitted to the roof over the Engine Manufacturing Centre and will provide enough electricity to power 30% of the factory’s needs. When the solar panels are working at full capacity, they will generate enough energy to power the equivalent of 1600 homes.