Find or Sell any Parts for Your Vehicle in USA

Abs Wheel Speed Sensor Fits 1998-2002 Lincoln Navigator Dorman Oe Solut on 2040-parts.com

US $95.11
Location:

Rockville Centre, New York, United States

Rockville Centre, New York, United States
Condition:New Quantity Sold:sold individually Feature - Benefit 2:Direct replacement for a proper fit every time SKU:RB:970-074 Feature - Benefit 3:Easy to install Brand:Dorman Position:Front Left Manufacturer Part Number:970-074 Quantity Needed:1; Life Cycle Status Description:Available to Order Other Part Number:72-5698, 5S6071, BRAB117 National Popularity Code:D Interchange Part Number:XL3Z2C204CB, ALS201, ABS312, 1802-305257, SU7604 NPS:D Feature - Benefit 4:Quality tested to ensure long-lasting performance Harmonized Tariff Code (Schedule B):9032900000 UPC:Does not apply

ABS System Parts for Sale

Citroën Lacoste Concept at Paris

Mon, 20 Sep 2010

The Citroen Lacoste Concept - A Gallic Mini Moke? You would be entirely forgiven for taking one look at the photo at the top and deciding it was a another over the top Golf Buggy for golfers with more money than taste (no, I’m not going there). But if it’s not a mad golf buggy there’s only on other thing it could be – a daft concept from Citroen; a speciality of the French maker, especially at their home Motor Show.

BMW to supply Toyota with 1.6 & 2.0 litre diesel engines.

Thu, 01 Dec 2011

Toyotas to get BMW diesel engines in Europe It has been announced that BMW are to supply Toyota with 1.6 and 2.0 litre diesel engines for Toyota cars in Europe from 2014. Last week we revealed that BMW and Toyota were discussing swapping engines and hybrid technology in an effort to cut costs and improve products. And now we have the first fruits of those discussions confirmed.

GM delays second shift at Volt plant

Fri, 07 Oct 2011

General Motors is delaying the addition of a second shift at its Michigan assembly plant that makes the Chevrolet Volt. In May, GM said that it would add a second shift at its Detroit-Hamtramck plant by late this fall to double Volt production. Instead, a plant overhaul completed this summer, along with a more-modest addition of workers, will allow GM to double production starting early next year while remaining on one shift, the company said Friday.