Arctic Cat Primary Ignition Coil 500 Cc Suzuki Engines on 2040-parts.com
Montoursville, Pennsylvania, US
primary ignition coil new in box for 500 cc arctic cat snowmobile Suzuki engine
Mitsubishi bringing i MiEV Sport Air concept to Geneva
Mon, 26 Jan 2009Mitsubishi will show another iteration of its sporty micro-size electric car with the debut of the i MiEV Sport Air concept at the Geneva motor show in March. Building on the i MiEV Sport, which we first saw at the Tokyo motor show in 2007, Mitsubishi adds a clear removable roof and slight alterations to the front fascia. A lithium-ion battery powers three magnetic synchronous motors--one in each front wheel and one to drive both rear wheels--with an all-wheel control system managing stability and traction control, and ABS for optimal stability and performance.
Top Gear’s James May crashes
Thu, 01 Oct 2009James May has a mishap with a hot air balloon and a caravan in Cambridgeshire But now it’s Captain Slow’s turn to have a bit of a coming together, Appropriately, considering his apparent aversion for the flamboyant and reckless, he managed to do it in a hot air balloon. Which means it was another of Top Gear’s mad races, this time with May in a caravan attached to a hot air balloon over the Cambridgeshire countryside, and the Hamster in a Lambo. The hot air balloon was meant to land on the village green at Eltisley in Cambridgeshire.
New Range Rover gets Bridge of Weir Leather
Mon, 22 Oct 2012The new Range Rover (2013) is getting its sumptuous leather interior courtesy of Bridge of Weir Low Carbon Leathers Land Rover’s supplier of choice for the Range Rover’s leather is Bridge of Weir Leather Company, part of the Scottish Leather Group and a privately owned Scottish Company that just happens to be the UK’s only automotive leather manufacturer (although they may need to rephrase that in a couple of years if Alex Salmond gets his way). The big shout is that Bridge of Weir’s leathers are low carbon, but what’s more interesting than the trendy (and, some would say, pointless) shout out is just how efficient Bridge of Weir are. The Bridge of Weir factory has its own Thermal Energy Plant which provides 70 per cent of its needs (and will provide it all by 2015) and all the waste products are recycled instead of being discarded.