Find or Sell any Parts for Your Vehicle in USA

Audi 6 Speed Shift Box 00 01 02 S4 B5 2.t Bi-turbo 4b0-711-025j on 2040-parts.com

US $185.00
Location:

West Shokan, New York, United States

West Shokan, New York, United States
Nice Condition-tested and guaranteed
Brand:ORIGINAL AUDI Warranty:Yes

Here is a nice used 6 speed Shift Box from an 00 Audi S4 2.7T. Comes as shown. Please compare your part number with ours to be sure it is a match before you order. 
If you have a question or you want to know if this item will fit your car or are interested in any other parts please contact us.

We have specialized in used Audi parts since 1980 and we will be glad to answer any questions you may have.

PLEASE CONTACT  US FOR SHIPPING QUOTES TO PUERTO RICO, HAWAII, AND ALASKA. DO NOT PURCHASE UNTIL YOU CONTACT US IF YOU ARE IN ANY OF THESE LOCATIONS.

 

ALL ITEMS WILL SHIP SAME DAY IF ORDERED BEFORE 3:30 PM EST MONDAY TO  FRIDAY WITH THE EXCEPTION OF ENGINES AND TRANSMISSIONS. ITEMS ORDERED ON THE WEEKEND WILL SHIP OUT ON MONDAY. ALL BUYERS WILL RECEIVE A TRACKING NUMBER FOR THE SHIPMENT.

 

ALL ITEMS COME WITH A 6 MONTH EXCHANGE WARRANTY (PARTS ONLY)

Renaultsport Megane N4 rally car (2010) first pics

Wed, 08 Dec 2010

Renault's added the new Megane Renaultsport N4 to its current rally range. The N4 draws on a group of heritage Renaults stretching over a quarter of a century - including the 5 GT Turbo, R11 Turbo, R21 Turbo, R19 16V, Clio Williams and Clio Renaultsport. To cope with all sorts of terrain, the Megane uses three-way adjustable shock absorbers.

New V6 for 2015 Ford F-150 to be built in Ohio

Fri, 28 Mar 2014

Ford Motor Co. is investing $500 million to build a new compact, lightweight turbocharged V-6 engine for the redesigned F-150 pickup at a plant in Lima, Ohio. Ford introduced the 2.7-liter engine in January at the North American International Auto Show in Detroit along with the 2015 F-150.

Toyota's quake-hit Yaris plant offline for at least another month

Wed, 30 Mar 2011

Toyota's quake-hammered Miyagi assembly plant, which makes the Yaris small car for export to the United States, is expected to be offline for at least another month. Workers have completed repairs at the factory and restored electricity, but the facility cannot get supplies of natural gas, a person familiar with the situation said. The assessment underscores the long road facing Toyota and other Japanese automakers in bringing plants back into full operation following the deadly quake, which killed more than 11,000 people, ruptured gas lines, shutdown electric grids and snarled logistics across half the country.