Parts for Sale
Piper nose gear torque link half(US $29.99)
Housing 278d521pb(US $19.99)
Io-470 series engine parts catalog(US $19.99)
Aircraft ext.tank certifier fairchild p/n 160d997937-1(US $199.99)
Lot of continental 470, 520 engine connecting rods, 40742(US $24.99)
Piper pedal assembly(US $24.99)
Mitsubishi revamps U.S. strategy
Mon, 24 Jan 2011Mitsubishi plans a different U.S. model lineup and a new production strategy for its assembly plant in Normal, Ill., as it shifts emphasis away from regionally focused vehicles to global small cars, hybrids and electrics. Shinichi Kurihara, CEO of Mitsubishi Motors North America, says the company will launch four new models in the United States within three years, as four slow-selling U.S.-built vehicles are phased out of production by 2014.
2011 VW Passat Price & Model detail
Mon, 18 Oct 20102011 Volkswagen Passat Price & Model detail released Volkswagen gave us the very slightly facelifted 2011 VW Passat a few weeks ago. They like to call it the seventh generation Passat, but when we reported the reveal at the Paris Motor Show we said we struggled to see it as a anything more than six and three-quarters as its underpinnings are identical. Actually, Passat 6.5 might be e better description.
Lamborghini CO2 reduction Press Release
Sun, 07 Jun 2009Lamborghini CO2 Reduction Press Release • The construction of a large photovoltaic plant, combined with an energy-saving project, will achieve a 30% reduction in the factory’s CO2 emissions by 2010 • Modifications to vehicles will result in a 35% reduction in CO2 emissions by 2015 Automobili Lamborghini announces its intention to complete its program of environmental sustainability in record time by presenting new plans which will enable the company: The plans for reducing emissions will thus involve two areas: modifications to the Lamborghini factory in Sant’Agata Bolognese, and development in vehicle design. To redefine its industrial processes in accordance with its policy of environmental sustainability, Lamborghini has just begun a project to complete installation of a large photovoltaic system by the end of 2009. The roof-top plant will produce 1,582 Megawatt hour (MWh) of “green” energy per year, which translates into a 20% reduction in CO2 emissions (-1,067,820 Kg/year) by 2010.