Find or Sell any Parts for Your Vehicle in USA

Big Dog Wire Harness 4000-02a + Puppy-02a Bdm New on 2040-parts.com

US $75.00
Location:

Harrisville, Michigan, US

Harrisville, Michigan, US
Returns Accepted:ReturnsNotAccepted Part Brand:BIG DOG Placement on Vehicle:Front Warranty:No Country of Manufacture:Unknown Manufacturer Part Number:4000-02A + PUPPY-02A

HELLO, UP FOR BIDS IS A BIG DOG WIRE HARNESS NEW IN BAG.PART # 4000-02A + PUPPY 02A WITH ANOTHER BAG WITH TERMINAL ENDS, BDM, SHIPPING AND HANDLING IS $15.00 TO BE PAID BY THE BUYER.IF YOU DO NOT LIKE ARE SHIPPING AND HANDLING CHARGES PLEASE DO NOT BID!! THANKS,CHECK OUT OUR OTHER AUCTIONS, FOR MORE NEW BIG DOG ACCESSORIES.PLEASE ASK ANY QUESTIONS BEFORE BIDDING.

Electrical Components for Sale

California racetrack serves wine in a can

Fri, 29 Apr 2011

A NASCAR race may be a prime place for knocking back cold beers, but those looking to class up their racing libations can now reach for a chilled Flasq wine in an aluminum can shaped like a bottle. Sonoma Valley, Calif.'s, Infineon Raceway, the site of one of NASCAR's road-course races, has entered into a partnership with California-based Flasq, which is domestic wine sold in quick-chilling and 100 percent recyclable bottles. Starting with this weekend's Ferrari challenge, Flasq will be available at the track throughout the 2011 racing season.

McLaren MP4-12C vs Ferrari 458 Italia: the video

Thu, 26 Aug 2010

McLaren vs Ferrari: F1's nastiest rivalry is spilling onto the road, and the new issue of CAR Magazine delivers the world's first deep dive comparing Woking's 12C with Maranello's sensational 458. It's the most anticipated supercar showdown for almost two decades, and it's only in CAR magazine (out 18 August). We've stripped the McLaren bare, to deliver a 15-page technical lowdown on the 12C.

Jaguar Land Rover installs UK's largest solar roof

Tue, 08 Apr 2014

THE LARGEST EVER solar panel roof has been completed at the Jaguar Land Rover (JLR) engine factory in South Staffordshire. More than 21,000 solar cells have been fitted to the roof over the Engine Manufacturing Centre and will provide enough electricity to power 30% of the factory’s needs. When the solar panels are working at full capacity, they will generate enough energy to power the equivalent of 1600 homes.