Bmw Genuine Map Sensor (manifold Absolute Pressure) E24 E28 E30 on 2040-parts.com
Alhambra, United States
Sensors & Switches for Sale
- Beck arnley 201-1977 brake limit switch/brake light switch(US $13.99)
- This is a new ford hvy truck buzzer low brake air pressure switch# e7hz-2573-aa(US $75.00)
- Acdelco pt392 stop lamp switch connector(US $23.05)
- 2005 acura tl oem yaw rate g sensor 1 axis p/n 39960-sfe-003(US $59.95)
- New original front brake pad sensor 7l0907637 fit for audi q7 vw touareg porsche(US $7.90)
- New genuine ford motorcraft 2l2z2c190ac rear anti lock brake abs sensor brab-214(US $58.00)
Ford Taurus SHO-stopper in Chicago?
Thu, 05 Feb 2009The new Ford Taurus SHO is shaping up to be a sleeper. Spy shooters have caught what appears to be the performance version of the new Ford flagship--and it looks almost exactly the same as the regular car. There's a SHO badge on the back--which is stickered over--and uh, nothing else.
Audi S1 at Paris
Sat, 11 Sep 2010The Audi S1 will have a Paris Launch (A1 Wörthersee Concept pictured) It’s getting on for a year since we reported that – despite some saying it wouldn’t happen – Audi were planning at least a warm version of the A1 and had on the drawing board the Audi S1 to take on the MINI Cooper. So it’s not a shock that we hear Audi are planning on bring the S1 along to Paris for a reveal before getting the S1 on the roads by the second quarter of 2011. Expect the usual Audi S bits in the mix - bigger wheels, fettled suspension, beefed-up brakes, body kit – and power in the S1 to come from the S/C turbo 1.4 TSI found in the VW Polo GTI, although the S1 may just get a tweaked version of the engine as befits its higher standing in the VW hierarchy with a bit more than the 178 horses the Polo GTI manages.
Call for reform over road repair funding
Fri, 06 Jun 2014FUNDING patterns mean most road maintenance is being carried out in "less-efficient, cold and wet" times, a report from a Government spending watchdog has said. The current pattern of funding, combined with the need to spend money within the financial year, means that most maintenance work goes on between September and March, said the report from the National Audit Office (NAO). It went on: "Although this is less disruptive for road users, it is less efficient than carrying out the work at other times of year because materials can be more difficult to handle in cold and wet conditions, and daylight hours are shorter." The report went on: "As a result of the additional funding for emergency repairs, which is made available at the end of the financial year, almost all highways authorities need extra capacity from the market at the same time, which makes it less likely that they will get value for money." The NAO report said there was a "lack of predictability" over road spending adding that historically, local highway authorities spent more revenue on maintenance, but were now carrying out fewer routine activities such as clearing gullies which are essential to preventing water seeping into roads' sub-structure.