Boyesen Rad51b-2 Rad Valve 2002-2009 Arctic Cat Snowmobiles on 2040-parts.com
Plymouth, Michigan, United States
Air Intake & Fuel Systems for Sale
- Boyesen rad86a-kit rage cage power pack 2004-2008 ski-doo mx-z 600(US $479.95)
- Complete airbox 2005 arctic cat z 370 with cdi box and coil ignition electrical(US $59.99)
- Spi gas gap replace 513-0329-01 for ski-doo summit 800 hm 2000(US $30.39)
- Spi gas gap replace 513-0329-01 for ski-doo summit hm 2000(US $30.39)
- Ski doo 404-1589-00,carburetor fuel filter,new, lot of 1
- Ski doo 404-0406-00 needle inlet,new, lot of 1
Alarming number of drivers lack road sign knowledge
Thu, 08 May 2014A THIRD OF DRIVERS in the UK do not know even the most basic road signs such as the National Speed Limit and Slippery Road warnings. This is the finding of a survey by More Than, which found that 34% of drivers in the UK did not know what the National Speed Limit sign was. The Slippery Road sign was misunderstood by one in seven drivers as meaning ‘paint on the road.’ With research conducted alongside 29 police forces, the survey found 20% of UK drivers had received penalty points for speeding in the past 10 years.
Button issues Triathlon challenge
Thu, 13 Feb 2014Formula 1 star Jenson Button is challenging his McLaren team-mates to down tools and race him - in the annual triathlon he organises. The 2009 world champion driver is signing up his mechanics to take part in the challenge being staged in July for the third year. Button is a keen athlete who has taken part in a number of triathlons over the years.
A14 expansion 'could break emissions laws'
Wed, 16 Oct 2013PLANS for tackling congestion on a busy A-road could leave the Government in breach of legal limits for air pollution, according to the Campaign for Better Transport (CBT). The CBT is warning that the Government's £1.5 billion A14 corridor in East Anglia would not only significantly worsen air pollution across a wide area; it could actually push a number of locations above current EU legal limits. The Government's proposal to tackle congestion within the A14 corridor includes widening parts of the A14 and the A1 and building a new dual carriageway around Huntingdon.