Bp14 Mx5 T25 Stage Ii Turbo Charger Upgrade Kit 300hp Boost For Mazda Miata 1.8 on 2040-parts.com
Rowland Heights, California, United States
Turbo Chargers for Sale
B20/b23/b230 full stage ii turbo charger upgrade kit 300hp boost for volvo 16v(US $758.88)
Z32 full stage iii twin turbo charger upgrade kit 500hp boost for nissan 300zx(US $888.88)
4g63 dsm 2g td05 full stage iii turbo charger 400hp boost kit for eclipse/talon(US $848.88)
Gt3037/gt3076r/gt30r dual ball bearing.73 full stage iii 500hp turbo charger kit(US $1,444.43)
T3/t4 hybrid .48 a/r .50 full stage ii 300+hps boost turbo charger upgrade kit(US $1,066.66)
Sr20det stage ii turbo charger 300hp ram horn kit for 89-98 nissan 240sx s13 s14(US $499.99)
Ferrari 458 Italia – in the flesh
Fri, 07 Aug 2009New Ferrari 458 Italia out testing And today we’ve had drop in to our inbox a picture of a 458 Italia in the flesh, which gives far more idea of perspective than the artfully-lit studio shots Ferrari released. It’s no real surprise that 458s are running around, with the official reveal only a matter of weeks away at the Frankfurt Motor Show. And Ferrari hasn’t gone to huge lengths to disguise this car – just some black and white paintwork.
New Freelander prices revealed
Wed, 20 Sep 2006By Nathan Millward Motor Industry 20 September 2006 01:55 Land Rover's new Freelander is more powerful, refined, spacious – and pricier. The range will kick off at £20,935, and first deliveries are due in November. The new Freelander range is five-door only, and Land Rover is launching with the most potent engine versions: a 158bhp 2.2-litre diesel and a 229bhp 3.2-litre straight six petrol.
TFL to get more poweres over roads
Wed, 27 Nov 2013GREATER POWERS will be given to Transport for London to enforce road alterations after legislation finally cleared parliament. TfL and London borough councils will also be able to ensure builders' skips are properly lit and make developers pay for any damage they cause to roads or footpaths. But the changes, contained in the London Local Authorities and Transport for London (No.2) Bill, have taken exactly six years to pass through parliament.