Brake Pads For Harley Davidson - 08 Up, Touring, By Ferodo. on 2040-parts.com
Bishop, California, United States
A new set of sintered Ferodo Brakepads - HH rated, for - 08 and up touring and - 08 to - 13 Trike, replaces H D # 41854-08
|
Accessories for Sale
- Universal licence plate bracket for motorcycle with dot reflector.
- Chrome logo motorcycle bar ends weights sliders for suzuki 600 750 1000 hayabusa
- Chrome custom logo bar ends weights sliders streetbike bike kawasaki ninja zxr
- Suzuki "gsxr" 600 750 1000 hayabusa motorcycle swingarm sliders spools black
- New black brake clutch flame levers for kawasaki vulcan 1500 1600 2003-2008(US $20.90)
- Lost key cut using key code hayabusa gsxr 600 750 1000 1300 sv 650 1000 dl gsx(US $20.00)
2014 Dodge Dart Blacktop to debut at Detroit auto show
Tue, 07 Jan 2014The 2014 Dodge Dart SXT will get the Blacktop treatment at the Detroit auto show next week. The company offered the same styling tweaks last year on the Journey, Durango and Grand Caravan. The Blacktop trim adds 18-inch gloss black wheels, gloss black side mirrors, and a sportier interior to the small sedan, as well as a black split-crosshair grille, dark headlight bezels and a few other bits.
Jaguar XJ 3.0 TDV6 Long Term Test (2010): The Intro
Sun, 31 Oct 2010Our long-term XJ joins last week's review car - the XF S We moaned about the tease that was the introduction to the new Jaguar XJ, but we dutifully went off to the press launch at the Saatchi Gallery in July 2009 and declared the design a triumph. We looked forward to the promised press cars by Christmas 2009, but they never happened as Jaguar worked to make the new XJ as bullet-proof as a car can be. But by the end of May 2010 the first press cars started to arrive and the first customer cars escaped in to the wild.
July 9: Keeping it topped off
Fri, 09 Jul 2010As expected, when I walked back to my parking space at VSP parking across the street from Burbank Airport the i-MiEV was fully charged. No problem. It had more than 24 hours to get charged and it can't take more than 16 hours to do it, if you figure one hour per kWh at 120 volts.