Cable Pull, Manual Transmission Linex 27.44.06 For Sprinter 3-t Bus (b903) 2.9 1995-2- on 2040-parts.com
Manual Transmission Parts for Sale
- Fit for ford f250 f350 parking brake assembly transmission e9ta-2598-aa(US $872.99)
- For ford f250 f350 1988-2002 parking brake assembly transmission e9ta-2598-aa(US $875.99)
- For 1988-2002 ford f250 f350 parking brake assembly transmission e8tz-2c598-b(US $878.99)
- For 1988-2002 ford f250 f350 parking brake assembly transmission e8tz-2c598-b(US $870.89)
- Joint, shift rod auger 54829 for man m90 4.6 1994-1996-(US $)
- High quality trucks and cars auto parts rear leaf spring 1325129581002(US $245.00)
GM recalls 2013 Cadillac SRX, Buick LaCrosse for software fix
Wed, 20 Mar 2013General Motors is recalling about 26,500 copies of the 2013 Buick LaCrosse sedan and Cadillac SRX crossover for a software problem that could cause the automatic transmission to shift out of manual mode. The affected vehicles are equipped with the Driver Shift Control feature, which allows the driver to shift the automatic transmission similar to a manual transmission. GM said in a report filed with the National Highway Traffic Safety Administration that the software problem may cause the transmission to shift unexpectedly from manual mode back to the automatic transmission, which removes any transmission-related engine braking.
Seat unveils a hybrid: Leon Twin Drive Ecomotive
Fri, 23 Jan 2009By Gareth Evans First Official Pictures 23 January 2009 09:00 Seat showed its prototype Leon Twin Drive Ecomotive today at its technical centre near Barcelona. The finished petrol-electric hybrid is expected in showrooms by 2014. The new hybrid Leon uses Twin Drive with power generated by an electric motor for shorter, urban trips while, for longer drives, the car seamlessly switches to an internal combustion engine.
Ford Design Center set to expand
Wed, 13 Apr 2011Symbolic of the importance it plays in Ford's small car strategy, the automakers Design Center in Cologne, Germany, is about to receive a €11.6m redevelopment. Construction is already underway on the facility's new wing, which will include design studios and 100 workplaces. The 3,000 square-meter extension is set to be completed by the end of the year.