Cadillac Sts V Hid Right Side Head Light Xenon Bulb Ballast For Parts Retrofit on 2040-parts.com
San Jose, California, US
Headlights for Sale
- 05-09 mustang led ring halo chrome crystal houding headlights front lamps set(US $58.23)
- 10-13 mustang black halo projector headlights w/daytime running lights built-in(US $244.21)
- Passenger right side headlight lamp assembly replacement 2007-2010 dodge charger(US $65.19)
- 1994-2001 dodge ram 1500 2500 smoke headlights black lamps front euro pair set(US $86.10)
- 6k slim hid kit+00-06 silverado suburban tahoe euro headlights+bumper lights(US $60.77)
- 09-13 ford f150 twin ccfl halo led projector headlights+led tail head lights set(US $379.99)
Secrets of bidders: Is this your year to steal a car at the Arizona auctions?
Wed, 14 Jan 2009Each January, enthusiasts flock to Arizona for the most exciting events on the auction calendar. Seven companies--Barrett-Jackson, RM Auctions, Gooding & Co., Russo and Steele, Kruse International, ICA Auctions and Silver Auctions--will duke it out, with more than 3,000 collector cars on the block. But with real estate tanking, the economy in a tailspin, consumer confidence at an all-time low, retail car sales bottoming and automakers begging for loans in Washing-ton, is this any time to buy an old car at auction?
Carmel kicks off concours craziness
Wed, 14 Aug 2013Consider the Monterey car week begun! The Carmel-by-the-Sea Concours-on-the-Avenue launched with its best-ever crowd and what many were calling the best-ever show for the free-to-the-public event held every Tuesday before the Pebble Beach Concours on Ocean Avenue in Carmel. Eighteen blocks total were shut to traffic and jammed with collector cars, everything from classic 911s celebrating that car's 50th anniversary to Ferraris, Trans Am racers and a whole block of Shelby Cobras.
Ten days and counting, China traffic jam extends 60 miles
Tue, 24 Aug 2010Tuesday marked the 10th day of a traffic jam extending more than 60 miles on China's Beijing-Tibet Expressway. The congestion is a result of road construction that is expected to continue until mid-September, the Associated Press reported. At one point, vehicles were moving little more than a half-mile a day.